NORWAY · WELLBORES · NPDID 2505

1/3-7

Exploration · Appraisal · P&A · Oil · Elf Petroleum Norge AS · Oselvar · PL 065

4 documents: reports, logs, and plots →

1/3-7 is an appraisal exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Feb 13, 1995, to 3,345 m in the Våle Fm.

Discovery 1/3-6 Oselvar · On the map →

3,345
m total depth · 3,342 m vertical
72
m water depth
Feb 13, 1995
entered · completed May 25, 1995
Våle Fm
at total depth · Paleocene
74.5
m of core in 4 cores
136
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 25, 1997

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST EPSILON · Jack-up 3 legs
Drilling days
102
Kelly bushing elevation
44.7 m
Maximum inclination
7°
Drilling permit
804-L
Licensing round
6
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.94032° N, 2.67628° E
Hydrocarbons in
Forties Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 1/3-7 is located on the Hidra High in the North Sea. It was drilled to appraise the 1/3-6 Oselvar condensate discovery made in Paleocene Forties Formation sandstones. The well was placed down-flanks on the structure relative to the discovery well in order to penetrate the hydrocarbon-water contact and further appraise reservoir properties and production rates.

Operations and results

Appraisal well 1/3-7 was spudded with the 3 leg jack-up installation West Epsilon on 13 February 1995 and drilled to TD at 3345 m in the Paleocene Våle Formation. A gas kick was taken at 1740 m in the top of the Hordaland Group, later it was found that the gas probably originated from a limestone less than one meter thick. The hole packed off, the string had to be cut off at 1564 m, and the hole was plugged back. A technical sidetrack (1/3-7 T2) was made from 1204 m. This sidetrack failed as the bit fell back into the original hole during a wiper trip. A new and successful technical sidetrack (1/3-7 T3) was made from 1202 m. A second gas kick occurred in the T3 sidetrack when reaching 1741 m. This kick was controlled by the driller's method without significant problems or extra rig time. The extra activity caused by the first kick prolonged the rig time with 23 days. Due to poor hole conditions no open hole logging was performed in the 12 1/4" section. As the West Epsilon was available only up to 28 May open hole logging at final TD was also abandoned in order to secure time for the well test. The reservoir was logged through casing. The well was drilled with sea water down to 207 m and with gelled mud from 207 m to 1204 m. From 3103 m to TD it was drilled with a salt polymer.

Top Forties Formation was encountered at 3175 m. The Forties

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.