NORWAY · WELLBORES · NPDID 2573

25/8-6

Exploration · Appraisal · P&A · Oil · Esso Exploration and Production Norway A/S · Jotun · PL 027 P

3 documents: reports, logs, and plots →

25/8-6 is an appraisal exploration wellbore in the North Sea, drilled by Esso Exploration and Production Norway A/S, entered May 19, 1995, to 2,577 m in the Ekofisk Fm.

Discovery 25/8-5 S Jotun · On the map →

2,577
m total depth · 2,569.5 m vertical
128
m water depth
May 19, 1995
entered · completed Jun 27, 1995
Ekofisk Fm
at total depth · Paleocene
67.4
m of core in 8 cores
88
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 27, 1997

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VILDKAT EXPLORER · Semisub steel
Drilling days
40
Kelly bushing elevation
25 m
Maximum inclination
13.39999962°
Drilling permit
813-L
Licensing round
Awarded additionally to round 2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.47178° N, 2.33760° E
Hydrocarbons in
Heimdal Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 25/8-6 was drilled to appraise the 25/8-5 S Discovery (Jotun) resource base and to confirm the OWC. The well is located close to the crest of the field, close to the western block boundary and PL103, who participated in the well.

The well was drilled as a possible future vertical sub-sea producer.

Operations and results

Appraisal well 25/8-6 was spudded with the semi-submersible installation "Vildkat Explorer" on 19 May 1995 and drilled to TD at 2565 m. The well was drilled with seawater and hi-vis pills down to 1060 m and KCl/glycol mud from 1060 m to TD. Due to bad hole condition it was impossible to get wire line logs below 1460 m. The well was plugged back on 6 June and technically sidetracked& (25/8-6T2) from just below the 13 3/8" casing at 1073 m using "Lo-Tox" mineral oil based mud. This well bore built up to 13& at 1329 m and then dropped back to vertical at 1600 m, the well was kept vertical down through the reservoir. It was drilled to TD at 2577 m in the in the Early Paleocene Ekofisk Formation. Successful wire line logging was achieved in this well bore. The well confirmed oil in the Heimdal Formation with OWC at 2090 m TVD SS (2122.6 m RKB in the technical sidetrack) in clean sand.

Eight cores were cut in the first well bore. Two were cut in shales of the Lista Formation (2054m to 2057 m and 2057 m to 2065 m). Due to very slow coring rate, coring was discontinued and a 12 1/4" hole was drilled down to 2077 m at the next core point. Six cores were subsequently cut in Heimdal Formation sandstone in the interval 2077 m to 2137.5 m. MDT fluid samples were taken in the Heimdal Formation at 2082.2 m (oil), 2122.1 m (oil), 2123.0 m (water + ca 15% oil), 2143.5 m (water), and 2145 m (water). After running TD logs, a string of 10-3/4" x 9-5/8" production casing was run and cemented, and the well was suspended on 27 June 1995 as an oil appraisal and potential future

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2573, documented in the API reference.