NORWAY · WELLBORES · NPDID 2574

34/10-39 S

Exploration · Wildcat · P&A · Dry · Den norske stats oljeselskap a.s · PL 050

4 documents: reports, logs, and plots →

34/10-39 S is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered May 31, 1995, to 3,290 m in the Statfjord Gp.

On the map →

3,290
m total depth · 3,142 m vertical
140
m water depth
May 31, 1995
entered · completed Jun 20, 1995
Statfjord Gp
at total depth · Early Jurassic
—
m of core
114
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 27, 2026 · RELEASED JUN 20, 1997

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA BERGEN decom · Semisub steel
Drilling days
21
Kelly bushing elevation
23 m
Maximum inclination
0°
Drilling permit
812-L
Licensing round
Awarded additionally to round 3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.21244° N, 2.02559° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/10-39 S was drilled on mid-way between the Gullfaks and Statfjord Fields on Tampen Spur in the North Sea.

Operations and results

Wildcat ell 34/10-39 S was spudded with the semi-submersible installation Deepsea Bergen on 31 May 1995 and drilled to TD at 3290 m (3142 m TVD) in the Early Jurassic Statfjord Group. No significant problem was encountered in the operations. The well was drilled with seawater and hi-vis pills down to 476 m, with KCl/polymer mud from 476 m to 2060 m, and with ANCO 2000 mud from 2060 m to TD.

The Viking Group was encountered at 2482 m (2448 m TVD) and consisted of 22 m TVD of excellent source rock Draupne Formation and 55 m TVD of Heather Formation. The top of the Brent Group was penetrated at 2562 m (2525 m TVD), approximately 50 m lower than prognosed and proved to be water bearing. The Cook Formation was also water bearing. The well was extended to the Statfjord Group, which also proved to be water bearing. Weak oil shows were recorded in some siltstones in the interval 2310 m to 2400 m in the Shetland Group, otherwise no signs of hydrocarbons were observed in the well.

No cores were cut. Very good FMT pressure points were acquired, but no fluid sample was taken.

The well was permanently abandoned on 20 June 1995 as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2574, documented in the API reference.