NORWAY · WELLBORES · NPDID 262

2/7-3

Exploration · Wildcat · P&A · Oil/gas · Phillips Petroleum Company Norway · Eldfisk · PL 018

13 documents: reports, logs, and plots →

2/7-3 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Apr 14, 1972, to 4,359 m in the Zechstein Gp.

Discovery 2/7-1 Eldfisk · On the map →

4,359
m total depth
69
m water depth
Apr 14, 1972
entered · completed Oct 11, 1972
Zechstein Gp
at total depth · Late Permian
19.8
ft of core in 4 cores
134
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 11, 1974

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ORION · Jack-up 3 legs
Drilling days
181
Kelly bushing elevation
28 m
Maximum inclination
4.5°
Drilling permit
68-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
56.38381° N, 3.24572° E
Hydrocarbons in
Ekofisk Fm · Paleocene
Hydrocarbons in
Tor Fm · Late Cretaceous
Hydrocarbons in
Eldfisk Fm · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/7-3, was drilled on the southern compartment of the Eldfisk structure in the North Sea. The Eldfisk structure is a NNW-SSE trending partly salt-related anticlinal structure located between the Valhall and Embla fields to the south and the Ekofisk Field to the north. The primary objectives were to test the Danian Limestone, and the possibility of Jurassic sandstone development on the crest of the Eldfisk structure. Both objectives were expected to be ca 120 m thick. The Late Cretaceous carbonate, lower Cretaceous sandstones and Triassic sandstones were secondary objectives.

Operations and results

Wildcat well 2/7-3 was spudded with the jack-up installation Orion on the 14 April 1972 and drilled to TD at 4359 m in the Permian Zechstein Group. Note that the Daily Report records Decca final fix as 56° 23' 01.7"N, 03° 14' 44.6"E, 60 meters off desired location, while other parts of the Completion Report seems to record the coordinates of the slightly different planned well location. The well was drilled with seawater and hi-vis sweeps down to 482 m, with gypsum-CMC lignosulphonate mud from 482 m to 3195 m, and with salt saturated gypsum-CMC lignosulphonate mud from 3195 m to TD. Between 482 m and TD diesel was added to the mud.

The Danian section was 90 m thick, highly fractured, and yielded commercial quantities of oil. Logs and two drill stem tests (DST 1 and DST 2) in the Late Cretaceous rocks indicated low porosity and permeability. One hundred and fifty gross meter of Jurassic sandstones was penetrated in the well. Log analysis indicated the sands are very shaly and silty. Three of the sidewall cores from this interval were described as hard, black shale and the fourth as a very calcareous sandstone. Although the logs

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.