NORWAY · WELLBORES · NPDID 2666

6204/10-1

Exploration · Wildcat · P&A · Dry · Den norske stats oljeselskap a.s · PL 175

4 documents: reports, logs, and plots →

6204/10-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered Oct 28, 1995, to 2,709 m in the Basement.

On the map →

2,709
m total depth · 2,707 m vertical
188
m water depth
Oct 28, 1995
entered · completed Nov 23, 1995
Basement
at total depth · Pre-Devonian
52.6
m of core in 4 cores
78
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 27, 2026 · RELEASED NOV 23, 1997

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA BERGEN decom · Semisub steel
Drilling days
27
Kelly bushing elevation
23 m
Maximum inclination
4.5999999°
Drilling permit
828-L
Licensing round
13
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
62.05569° N, 4.26017° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The objectives of well 6204/10-1 were to prove economic hydrocarbon reserves in the J-prospect (Turonian) and support play concept and possibly prove hydrocarbon reserves in the Jurassic lead. Further objectives were to achieve stratigraphic information and possibly prove reservoir sand and new play concepts in the Tertiary, Turonian and Cenomanian levels.

Operations and results

Well 6204/10-1 was spudded with the semi-submersible rig "Deepsea Bergen"on 28 October 1995 and drilled to 2709 m in basement rock within the planned budget. The 30", 13 3/8" and 9 5/8" casing strings were successfully set. No drilling problems were encountered. The well was drilled with seawater / bentonite hi-vis pills / ANCO 2000 to 490 m and with KCl polymer mud from 490 m to TD. Four cores were cut, one in Tertiary and three in Cretaceous. No fluid samples were taken.

The well proved the geological model of the J- prospect. Unexpected conglomeratic sandstones devoid of fossils, probably eroded basement, were encountered in the lower part of the well and the well was terminated before reaching the planned TD.

No hydrocarbons were encountered, and the well was plugged and abandoned as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2666, documented in the API reference.