NORWAY · WELLBORES · NPDID 269

2/7-10

Exploration · Appraisal · P&A · Oil · Phillips Petroleum Company Norway · Edda · PL 018

4 documents: reports, logs, and plots →

2/7-10 is an appraisal exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Oct 6, 1973, to 3,370 m in the Tor Fm.

Discovery 2/7-4 Edda · On the map →

3,370
m total depth
72
m water depth
Oct 6, 1973
entered · completed Dec 5, 1973
Tor Fm
at total depth · Late Cretaceous
—
m of core
108
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 5, 1975

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ZAPATA NORDIC · Jack-up 3 legs
Drilling days
61
Kelly bushing elevation
37 m
Maximum inclination
1.75°
Drilling permit
96-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.47547° N, 3.08325° E
Hydrocarbons in
Ekofisk Fm · Paleocene
Hydrocarbons in
Tor Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/7-10 was drilled on the Edda structure in the southern North Sea. The principal zone of interest was the Danian Limestone, which was found hydrocarbon-bearing ca 13 km to the northeast on the Ekofisk field, and which held commercial quantities of oil and gas in the 2/7-4 well on the Edda structure just over a mile to the southeast. The Danian sequence was expected to be ca 90 m thick. The Late Cretaceous was a secondary objective and could contain hydrocarbons if porosity was present.

Operations and results

Well 2/7-10 was spudded with the jack-up installation Zapata Nordic on 6 October 1973 and drilled to TD at 3370 m in the Late Cretaceous Tor Formation. Bad weather caused some technical problems and delayed operations for some days. The well was drilled water based, but with 3-4 % addition of oil below 2691 m. The Danian limestone sequence (Ekofisk Formation) was encountered at 3191 m. It was 90 m thick as prognosed but with only 6 m of gross pay, which, after acidization, yielded nothing commercial. The equivalent interval in the 2/7-4 well produced commercial oil and gas on the deepest of three drill stem tests. The Late Cretaceous Tor Formation, however, was found to have 31 m of potential pay, which correlates well with the 2/7-4 interval. It flowed commercial amounts of oil and gas after acid, on two drill stem tests. The upper one of these compared well with the equivalent horizon in the 2/7-4, although less productive. Shows were recorded from top of the Ekofisk and all through the limestone/chalk section down to ca 3338 m in the Tor Formation.

No cores were cut and no wire line fluid samples taken in the 2/7-10 well

The well was permanently abandoned on 5 December 1973 as an oil appraisal.

Testing

Five successful DST's were carried out in the well. Maximum flow data after acidization follows: DST 1 from the interval 3313 - 3322 m (Tor Formation) produced 233 m3 water

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.