NORWAY · WELLBORES · NPDID 2699
2/1-11
Exploration · Wildcat · P&A · Oil · BP Norway Limited U.A. · PL 019 B
2/1-11 is a wildcat exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Jan 14, 1997, to 4,725 m in the Smith Bank Fm.
Discovery 2/1-11 · On the map →
- 4,725
- m total depth · 4,697 m vertical
- 68.2
- m water depth
- Jan 14, 1997
- entered · completed May 7, 1997
- Smith Bank Fm
- at total depth · Late Triassic
- —
- m of core
- 167
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAY 7, 1999
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MÆRSK JUTLANDER · Semisub steel
- Drilling days
- 114
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 30°
- Drilling permit
- 877-L
- Licensing round
- 1-A
- Plugged and abandoned
- Feb 21, 2014
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.79313° N, 3.06616° E
- Hydrocarbons in
- Bryne Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 2/1-11 is located on the Hidra High in the Central Graben of the North Sea. It was drilled to investigate the possibility of commercial quantities of hydrocarbons in the Jurassic J60/J70 sandstones (Ula Formation). A secondary objective was to assess the reservoir potential of the older J50 Jurassic sandstone sequence.
Operations and results
Wildcat well 2/1-11 was spudded with the semi-submersible installation Mærsk Jutlander on 14 January 1997 and drilled to TD at 4725 m (4697 m TVD) in the Late Triassic Smith Bank Formation. At a depth of 724 m, while drilling riserless, the well was observed by the ROV to be flowing. Evidence of this flow was observed in the moon pool - a patch of light coloured water being apparent. The well was circulated with seawater while additional kill mud was built. A pilot hole was then drilled to the section TD of 1151 m with further flows being observed at 736 m, 802 m, 900 m, 939 m, 1112 m and 1121 m. Most likely the gas in all instances came from an interval between 650 and 724 m, which after drilling was correlated to a shallow biogenic gas warning at 638 identified in the site survey. The shallow gas problems led to a delay in installing a new cuttings handling system on the rig, required because of a late decision to use oil based mud in the 12 1/4" hole. No serious harm was done by the shallow gas but considerable rig time was spent. The well was planned vertical but a slight deviation is seen in the deviation survey, starting at ca 3600 m (3 deg deviation). At 4350 m the deviation had reached 10 deg, and at TD it was 30 deg. As a result MD is more than 5 m larger than TVD below 4450 m, and the difference is as much as 28 m at TD. The well was drilled with seawater and hi-vis sweeps down to 1162 m and with ENVIROMUL oil based mu
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.