2/1-11 is a wildcat exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Jan 14, 1997, to 4,725 m in the Smith Bank Fm.

Discovery 2/1-11 · On the map →

4,725
m total depth · 4,697 m vertical
68.2
m water depth
Jan 14, 1997
entered · completed May 7, 1997
Smith Bank Fm
at total depth · Late Triassic
—
m of core
167
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAY 7, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK JUTLANDER · Semisub steel
Drilling days
114
Kelly bushing elevation
23 m
Maximum inclination
30°
Drilling permit
877-L
Licensing round
1-A
Plugged and abandoned
Feb 21, 2014
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.79313° N, 3.06616° E
Hydrocarbons in
Bryne Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/1-11 is located on the Hidra High in the Central Graben of the North Sea. It was drilled to investigate the possibility of commercial quantities of hydrocarbons in the Jurassic J60/J70 sandstones (Ula Formation). A secondary objective was to assess the reservoir potential of the older J50 Jurassic sandstone sequence.

Operations and results

Wildcat well 2/1-11 was spudded with the semi-submersible installation Mærsk Jutlander on 14 January 1997 and drilled to TD at 4725 m (4697 m TVD) in the Late Triassic Smith Bank Formation. At a depth of 724 m, while drilling riserless, the well was observed by the ROV to be flowing. Evidence of this flow was observed in the moon pool - a patch of light coloured water being apparent. The well was circulated with seawater while additional kill mud was built. A pilot hole was then drilled to the section TD of 1151 m with further flows being observed at 736 m, 802 m, 900 m, 939 m, 1112 m and 1121 m. Most likely the gas in all instances came from an interval between 650 and 724 m, which after drilling was correlated to a shallow biogenic gas warning at 638 identified in the site survey. The shallow gas problems led to a delay in installing a new cuttings handling system on the rig, required because of a late decision to use oil based mud in the 12 1/4" hole. No serious harm was done by the shallow gas but considerable rig time was spent. The well was planned vertical but a slight deviation is seen in the deviation survey, starting at ca 3600 m (3 deg deviation). At 4350 m the deviation had reached 10 deg, and at TD it was 30 deg. As a result MD is more than 5 m larger than TVD below 4450 m, and the difference is as much as 28 m at TD. The well was drilled with seawater and hi-vis sweeps down to 1162 m and with ENVIROMUL oil based mu

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2699, documented in the API reference.