NORWAY · WELLBORES · NPDID 2772
35/11-8 S
Exploration · Wildcat · P&A · Oil/gas · Norsk Hydro Produksjon AS · Fram · PL 090
35/11-8 S is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Mar 3, 1996, to 3,624 m in the Drake Fm.
Discovery 35/11-8 S · On the map →
- 3,624
- m total depth · 3,355 m vertical
- 361
- m water depth
- Mar 3, 1996
- entered · completed May 11, 1996
- Drake Fm
- at total depth · Early Jurassic
- 95.9
- m of core in 4 cores
- 128
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 11, 1998
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TREASURE SAGA · Semisub steel
- Drilling days
- 70
- Kelly bushing elevation
- 26 m
- Maximum inclination
- 33°
- Drilling permit
- 841-L
- Licensing round
- 8
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.09043° N, 3.53746° E
- Hydrocarbons in
- Intra Heather Fm Ss · Late Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 35/11-8 S is located ca 15 km due north of the Troll Field. It was designed to test the hydrocarbon potential in the H-structure located in a down-faulted position west of the F/C complex where oil and gas was discovered in the wells 35/11-4 and -7. The main targets were the Brent Group and the Sognefjord Formation equivalent. Possible secondary targets were seen in Intra Draupne sandstone and a mound feature in the Paleocene sequence.
Operations and results
Wildcat well 35/11-8 S was spudded with the semi-submersible installation Treasure Saga on 3 March 1996 and drilled to TD at 3624 m (3355 m TVD RKB) m in the Early Jurassic Drake Formation. The well was drilled vertically in the top hole, starting to build angle below the 30" casing shoe at 447 m. From 950 m to 2250 m the deviation was kept at 31 ± 2°, from which point the inclination was gradually reduced towards a more vertical path. After the testing phase, operations were interrupted for some three days by an industrial strike. Operations went without significant technical problems. The well was drilled with spud mud down to 1233 m and with KCl/polymer mud from 1233 m to TD.
The Paleocene mound feature proved to consists of 66 m of water bearing sand with weak shows in the uppermost part.
The prognosed lead related to the high amplitude Intra Draupne reflector corresponded to the Late Jurassic source rock. A thin sandstone at the base of the Sognefjord Formation was water filled with weak shows. Oil and gas was discovered in a 115 m thick Late Jurassic turbiditic sandstone unit at 2860 m. The sequence could not be correlated with the Sognefjord Formation in the neighbouring wells and is classified as an Intra Heather Sandstone unit. From 2860 to 2881 m 20.7 m net pay gas reservoir showed a gas saturation of 89 % and the average porosity was calculated to 21.9 %. A 40.1 m net pay oil zone was calculated for the interval between 2881m and 2938 m.
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/2772, documented in the API reference.