NORWAY · WELLBORES · NPDID 2783

35/10-2

Exploration · Wildcat · P&A · Gas · Den norske stats oljeselskap a.s · PL 173

3 documents: reports, logs, and plots →

35/10-2 is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Apr 16, 1996, to 4,677 m in the Statfjord Gp.

Discovery 35/10-2 · On the map →

4,677
m total depth · 4,675 m vertical
372.5
m water depth
Apr 16, 1996
entered · completed Aug 22, 1996
Statfjord Gp
at total depth · Early Jurassic
100.9
m of core in 9 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED AUG 22, 1998

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN ARCTIC · Semisub steel
Drilling days
103
Kelly bushing elevation
24 m
Maximum inclination
0°
Drilling permit
843-L
Licensing round
13
Plugged and abandoned
Aug 22, 1996
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.03963° N, 3.04183° E
Hydrocarbons in
Tarbert Fm · Middle Jurassic
Hydrocarbons in
Ness Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 35/10-2 is located on the Flatfisk Slope approximately mid-way between the Fram and the Kvitebj ørn Discoveries in the Northern North Sea. The primary objective for the well was to explore the hydrocarbon potential of the Middle Jurassic Brent reservoir. The secondary objective was to explore the hydrocarbon potential of the Paleocene sandstones of the Goliath -prospect. Furthermore, the well would test the reservoir potential of the "intra Dunlin" (Cook Formation) and Statfjord sandstones. Planned TD was 5000 m MSL.

Operations and results

Well 35/10-2 was spudded with the semi-submersible installation Transocean Arctic on 16 April 1996. The original well path, 35/10-2, was drilled down to a total depth of 3301 m, where the mud motor parted. A technical sidetrack, named 35/10-2 T2 was necessary. This was kicked off at 2563 and the well was drilled down to TD for the well at 4677 m in the Early Jurassic Statfjord Formation. In the 8 3/8" section, severe problems were encountered due to mud losses. The hole was cemented back once to try and seal off the loss zones. The well was drilled with bentonite down to 1460 m, with ANCO 2000 mud from 1460 m to 3990 m, and with AncoTherm mud from 3990 m to TD

No reservoir quality sandstones of any thickness were found in the Tertiary. The seismic anomaly thought to represent the Goliath prospect, was in fact caused by a sequence of thin siltstones and very fine sandstones at 1953-1955 m in the Sele Formation. Good oil shows were observed in this interval. The top of the Brent Group was penetrated at 4149 m, almost 90 m higher than prognosed, and the reservoir proved to hold a gas column of approximately 72 m. The well penetrated sandstones in the Early Jurassic, (Cook, Amundsen and Statfjord Formations), but no hydrocarbons were observed in these. Due to this the well was not drilled to the planned TD.

Nine conventional cores were cut in the well

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2783, documented in the API reference.