NORWAY · WELLBORES · NPDID 279
2/8-9
Exploration · Appraisal · P&A · Oil · Amoco Norway Oil Company · Valhall · PL 006
2/8-9 is an appraisal exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Apr 9, 1976, to 2,703 m in the Rødby Fm.
Discovery 2/8-6 Valhall · On the map →
- 2,703
- m total depth
- 69
- m water depth
- Apr 9, 1976
- entered · completed Jun 27, 1976
- Rødby Fm
- at total depth · Early Cretaceous
- 38.9
- ft of core in 4 cores
- 86
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 27, 1978
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- SEDCO 135 G · Semisub steel
- Drilling days
- 80
- Kelly bushing elevation
- 33 m
- Maximum inclination
- 0°
- Drilling permit
- 155-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.29703° N, 3.38444° E
- Hydrocarbons in
- Tor Fm · Late Cretaceous
- Hydrocarbons in
- Hod Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 2/8-9 was drilled as an appraisal to help establish the commerciality of the southern North Sea Valhall Field, which had earlier been discovered by 2/8-6 and confirmed by 2/8-8. The primary objective of 2/8-9 was an evaluation of the Chalk reservoirs of Maastrichtian (Tor Formation) and pre-Maastrichtian (Hod Formation) age. The existence of hydrocarbons in the Early-Middle Miocene section creates a low velocity "bright spot" on the seismic, blanketing the crest of the Valhall structure and causing "dimming" or total loss of the top chalk section. The Valhall crest is therefore an area where the estimated thickness of the Tor section and the fault patterns are questionable. Only one previous well, 2/8-4, had been drilled in the vicinity some 2.5 km to the west. Well 2/8-4 was essentially a dry hole with only 1 m of Tor and tight but oil bearing Hod Formation.
Operations and results
Appraisal well 2/8-9 was spudded with the semi-submersible installation Sedco 135 G on 9 April 1976 and drilled to TD at 2703 m in the Early Cretaceous Rødby Formation. The well was drilled in a total of 30 days, without any major drilling problems. It was drilled with sea water and viscous mud down to 183 m, with seawater and gel from 183 m to 392 m, and with Drispac/lime/seawater mud from 392 m to TD.
Well 2/8-9 penetrated a normal of Quarternary -Tertiary section from surface to top of the Late Cretaceous. The Danian was found to have been removed by erosion. The well found the Chalk hydrocarbon bearing at 2524 m correlating 53.3 m high and 76.8 m low to wells 2/8-4 and 2/8-8, respectively. The Tor Formation was 5.5 m thick with high reservoir quality; porosity of up to 48% and a water saturation close to zero. The Ho
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/279, documented in the API reference.