NORWAY · WELLBORES · NPDID 289

2/11-6 S

Exploration · Appraisal · Suspended · Oil · Amoco Norway Oil Company · Hod · PL 033

14 documents: reports, logs, and plots →

2/11-6 S is an appraisal exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Sep 2, 1981, to 4,076 m in the Hod Fm.

Discovery 2/11-2 Hod · On the map →

4,076
m total depth · 2,957 m vertical
72
m water depth
Sep 2, 1981
entered · completed Feb 25, 1982
Hod Fm
at total depth · Early Cretaceous
19
m of core in 1 core
111
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 25, 1984

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SEDCO 703 · Semisub steel
Drilling days
177
Kelly bushing elevation
26 m
Maximum inclination
57°
Drilling permit
305-L
Licensing round
2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.17653° N, 3.46020° E
Hydrocarbons in
Tor Fm · Late Cretaceous
Hydrocarbons in
Hod Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/11-6 S was drilled on the Lindesnes Ridge in the southern North Sea. The objective was to appraise the Hod discovery made by well 2/11-2 in 1974 (Hod West) and appraisal well 2/11-3 in 1977 (Hod East). The Hod structure is oil-bearing in Late Cretaceous chalks, the Hod and Tor formations. Well 2/11-6 S targeted the Hod East structure.

Operations and results

Appraisal well 2/11-6 S was the first well to be drilled on a subsea template which was laid by the semi-submersible installation Sedco 703. It was then drilled with Sedco 703 through slot number W7 of the twelve slot templates, to TD at 3970 m (2905 m TVD) where the pipe got stuck. The pipe was shot off with top of the fish at 3669 m and a technical sidetrack 2/11-6 ST1 was kicked off from 3626 m. The sidetrack was drilled to the final TD at 4076 m (2980 m TVD). The initial well bore was drilled with seawater and hi-vis sweeps down to 1460 m, with Vertoil oil based mud from 1460 m to 3601 m, and with Oilfaze oil based mud from 3601 m to 3970 m. The 2/11-6 ST1 sidetrack was drilled with Vertoil oil based mud from kick-off to TD.

Well 2/11-6 drilled a nearly complete Tertiary section and penetrated top chalk at 3690 m (2732 m TVD). The sidetrack penetrated top of the chalk group at 3685 m (2729 m) with a slightly lower angle (50 deg) than in the initial well bore (55 deg). The chalk stratigraphy in the two well bores was very similar apart from the angle/depth shift. The well tested oil in the Tor / upper Hod formations and in the lower Hod Formation.

Seven conventional cores were cut from 3693 to 3741 m in the initial well bore before side tracking. The cores were cut in the Late Cretaceous Chalk. The total recove

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.