NORWAY · WELLBORES · NPDID 294

7/8-2

Exploration · Wildcat · P&A · Dry · Phillips Petroleum Company Norway · PL 016

5 documents: reports, logs, and plots →

7/8-2 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Jul 24, 1973, to 3,006 m in the Zechstein Gp.

On the map →

3,006
m total depth
81
m water depth
Jul 24, 1973
entered · completed Aug 29, 1973
Zechstein Gp
at total depth · Late Permian
—
m of core
104
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 29, 1975

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN VIKING · Semisub steel
Drilling days
37
Kelly bushing elevation
27 m
Maximum inclination
4°
Drilling permit
88-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
57.39426° N, 2.59172° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

The 7/8-2 (Cero) well was drilled on a domal structure approximately 6 km long by 6 km wide, situated on the Jæren High in the North Sea. It was estimated that at Paleocene depth there would be close to 40 square km of closure with 140 m of vertical relief and at Early Cretaceous depth 27 square km of closure with 150 m of vertical relief. The principal objective horizons were Paleocene, Jurassic and Triassic sands with the Danian-Cretaceous limestone as a possible secondary objective.

Operations and results

Wildcat well 7/8-2 was spudded with the semi-submersible installation Ocean Viking on 24 July 1973 and drilled to TD at 3006 m in anhydrite of the Zechstein Group. No significant problems are reported from the operations.

The well had no hydrocarbons or shows of hydrocarbons. In the Paleocene no sand beds were developed, although sand was present as a loose, unconsolidated constituent in most of the clays and shales. The Danian and Late Cretaceous limestones were tight. The Late Cretaceous section was 150 m thinner than anticipated due to erosion of the Coniacian to Cenomanian formations at the base. The Jurassic succession was encountered at 2808 m and top Triassic at 2883 m. Two Triassic sands were encountered at 2911 - 2937 m and at 2972 - 2996 m. The Triassic section was thinner than expected, being truncated at 2996 by the Permian Zechstein Group.

No cores were cut and no wire line fluid samples were taken in the well.

The well was permanently abandoned on 29 August 1973 as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/294, documented in the API reference.