NORWAY · WELLBORES · NPDID 296
7/12-3
Exploration · Appraisal · P&A · Dry · BP Norway Limited U.A. · Ula · PL 019
7/12-3 is an appraisal exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Apr 5, 1977, to 3,710 m in the Ula Fm.
Discovery 7/12-2 Ula · On the map →
- 3,710
- m total depth · 3,709 m vertical
- 71
- m water depth
- Apr 5, 1977
- entered · completed Jun 3, 1977
- Ula Fm
- at total depth · Late Jurassic
- 16.4
- m of core in 1 core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 3, 1979
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORSKALD · Semisub steel
- Drilling days
- 60
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 2.79999995°
- Drilling permit
- 174-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 57.10682° N, 2.81154° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 7/12-3 was drilled as an appraisal well on the western flank of the 7/12-2 Ula Discovery in the North Sea.
Operations and results
Appraisal well 7/12-3 was spudded with the semi-submersible installation Norskald on 5 April 1977 and drilled to TD at 3710 m in Late Jurassic sediments. The drilling, coring and logging of the well were of a routine nature. Plugging of the flow lines and screens by hydrating clays while drilling the 17-1/2" hole caused delays and the loss of considerable quantities of mud. Rates of penetration were less than anticipated in the Lower Cretaceous and Upper Jurassic mudstones/ shales. Ninety-four hours were lost through weather delays during the course of the well. The well was drilled with fresh water and gel down to 471 m and with Lime/Drispac mud from 471 m to TD.
Core, log and R.F.T. analyses proved the well to have penetrated the Jurassic reservoir discovered in well 7/12-2 beneath the oil water contact.
One core was cut in the Jurassic section, from 3612.2 to 3628.6 m. An RFT water sample was taken at 3683 m
The well was plugged back for sidetracking on 3 June as a dry well.
Testing
No drill stem test was performed.
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.