NORWAY · WELLBORES · NPDID 3060
6306/5-1
Exploration · Wildcat · P&A · Gas · Amerada Hess Norge AS · PL 197
6306/5-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Amerada Hess Norge AS, entered Jun 8, 1997, to 2,050 m in the Kvitnos Fm.
Discovery 6306/5-1 · On the map →
- 2,050
- m total depth · 2,044 m vertical
- 227.5
- m water depth
- Jun 8, 1997
- entered · completed Jul 10, 1997
- Kvitnos Fm
- at total depth · Late Cretaceous
- 5
- m of core in 1 core
- 74
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUL 10, 1999
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DEEPSEA TRYM · Semisub steel
- Drilling days
- 33
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 9.39999962°
- Drilling permit
- 892-L
- Licensing round
- 14
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 63.69901° N, 6.55980° E
- Hydrocarbons in
- Egga Fm (informal) · Paleocene
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
Wildcat well 6306/5-1 was drilled ca 190 km West of the town Trondheim, on the Klakk Fault Complex, which forms the border between the FrØya High and the MØre Basin. The two main objectives were to test the hydrocarbon potential of two Palaeocene prospects: the Eirikson prospect and the Nansen prospect. When drilled these prospects were prognosed as the Heimdal Formation sandstone and a new informal "Skalmen Formation sandstone", respectively. Only the Skalmen Formation was confirmed by the well. Later this formation has been encountered in other wells in the area as the (informal) Egga Formation.
Operations and results
Wildcat well 6306/5-1 was spudded with the semi-submersible installation Deepsea Trym on 8 June 1997. Operations went without significant problems down to the 8 1/2" section. This section was drilled from 1300 m to 1751 m, top of the Egga reservoir. This was found to be significantly over pressured and a large gain was taken. The well was shut-in and steps were taken to kill the well. The operation was complicated by the discovery that the pipe was stuck. The string was finally cut at 1477 m, and a cement plug was set to be used as kick-off plug for a sidetrack around the fish. The sidetrack was kicked off at 1365 m and drilled to TD at 2050 m in the Late Cretaceous Kvitnos Formation without further problems. The well was drilled with bentonite and seawater down to 1001 m and with ANCO 2000 mud from 1001 m to TD.
No shallow gas or boulder beds were encountered in the uppermost well section. The well penetrated mainly clays and claystones in the Nordland, Hordaland and Rogaland groups with minor sands developed and limestone stringers present. The prognosed Heimdal Formation sands were not present. Top Egga sand was reached at 1751 m and was 12 m thick. The lithology of the Egga sand was mainly a clean sandstone divided in two by a calcareous clay stone. Top of the Egga reservoir was re-penetrated in the sidetrack at
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/3060, documented in the API reference.