NORWAY · WELLBORES · NPDID 3087

9/2-7 S

Exploration · Wildcat · Re-class to dev · Oil · Den norske stats oljeselskap a.s · Yme · PL 114

5 documents: reports, logs, and plots →

9/2-7 S is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Apr 22, 1997, to 4,099 m in the Bryne Fm.

Discovery 9/2-7 S · On the map →

4,099
m total depth · 3,393 m vertical
77
m water depth
Apr 22, 1997
entered · completed Jun 10, 1997
Bryne Fm
at total depth · Middle Jurassic
53.8
m of core in 2 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 10, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BYFORD DOLPHIN · Semisub steel
Drilling days
50
Kelly bushing elevation
25 m
Maximum inclination
50.90000153°
Drilling permit
887-L
Licensing round
10-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
57.75421° N, 4.35604° E
Hydrocarbons in
Sandnes Fm · Late Jurassic
Hydrocarbons in
Bryne Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The deviated well 9/2-7 S was drilled as an exploration well to identify the oil potential in the Beta Vest prospect on the Yme Field in PL 114. The well was drilled in the northern segment of the Beta Vest structure with the sandstones of the Sandnes Formation as the target horizon. The well was planned to be completed as an oil producer and be renamed to 9/2-B-3H.

Operations and results

Wildcat well 9/2-7 S was spudded with the semi-submersible installation "Byford Dolphin" on 22 April 1997 and drilled to a total depth of 4099 m (3369.7 m TVD MSL) in the Middle Jurassic Bryne Formation. It was drilled from slot 3 on the Yme Beta HOST template with an "S" shaped profile in order to drill vertically through the Sandnes Formation. The Sandnes S12 target was penetrated approximately 1757 m North North-West of the template, at an inclination of about 5 deg. A 7" liner was run over the reservoir section. The bottom section fro 3923 m to TD was drilled with turbine and diamond bit. The well was drilled with seawater to 1192 m, with KCl polymer mud from 1192 m to 256 m, with ester-based Petrofree mud from 2576 m to 3867 m, and with Aquadrill glycol mud from 3867 m to TD. The well found oil all through the Sandnes Formation. The top of the Sandnes Formation was encountered at 3854 m (3125.6 m TVD MSL), with the top of the Sandnes Formation S11 reservoir sandstone at 3861,7 m (3133,3 m TVD MSL). The oil/water-contact was found in the Bryne Formation sandstones at 4067m MD (3337.9 m TVD MSL). Two cores were cut in the interval 3868 m - 3923 m in the Sandnes Formation. Two FMT fluid samples were taken at 3896 m in the Sandnes Formation oil zone. Exploration well 9/2-7 S was completed 10 June 1997 as an oil discovery and re-classified to development well 9/2-B-3 H.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3087, documented in the API reference.