NORWAY · WELLBORES · NPDID 3126

9/2-8 S

Exploration · Wildcat · Re-class to dev · Dry · Den norske stats oljeselskap a.s · Yme · PL 114

3 documents: reports, logs, and plots →

9/2-8 S is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jun 24, 1997, to 7,584 m in the Zechstein Gp.

Discovery 9/2-1 Yme · On the map →

7,584
m total depth · 3,345 m vertical
93
m water depth
Jun 24, 1997
entered · completed Feb 2, 1998
Zechstein Gp
at total depth · Late Permian
84.3
m of core in 4 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED FEB 2, 2000

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
YME · Jack-up 3 legs
Drilling days
203
Kelly bushing elevation
42 m
Maximum inclination
99°
Drilling permit
895-L
Licensing round
10-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
57.81877° N, 4.51972° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 9/2-8 S was drilled from slot 3 of the Yme template. The well was planned as an exploration well, to identify the hydrocarbon potential of the Yme Epsilon East and West structures. The well design was based on flexibility to enable later completion as a production well if commercial reserves of oil were encountered. The Epsilon East and West structures are developed on the east and west sides of a salt diapir. The well was planned to drill down through the sequence on the east flank with the Sandnes Formation being the primary target. As a secondary target the well was planned to extend a further 1600 m into Epsilon West structure. This involved drilling through the base of the salt diapir and then up through the sequence within the western flank. The Epsilon East structure was recognized as a fairly well defined prospect, comprising of an eastward dipping tilted fault block. Complicated tectonism affecting the Epsilon West structure however, meant this could only have the status of a lead. The main uncertainties with respect to probability of discovery were considered as leakage/trap and source/migration.

Operations and results

Wildcat well 9/2-8 S was spudded from the seabed with the jack-up installation "Mærsk Giant" on 24 June 1997. At 5936 m the BHA became stuck while drilling the Sandnes Formation. The well was subsequently sidetracked to 9/2-8S T2 from 5680 m on the 4 October 1997. The T2 sidetrack was only drilled to 6011 m due to the BHA becoming stuck at 6002 m while pulling out of hole. A further sidetrack, 9/2-8S T3, was drilled from 5628.5 m, on 19 October 1997 and reached a TD of 7203 m on 16 December 1997. This sidetrack failed to penetrate the Vestland Group, passing from Zechstein salts of the faulted zone straight into the shales of the Tau Formation. As a result a final sidetrack, 9/2-8S T4, was started from 6144 m on 21 December 1997. This wellbore reached final TD at 7584 m in the Late Jurassic Egersund formation on 18 January 1998 after

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.