NORWAY · WELLBORES · NPDID 3126
9/2-8 S
Exploration · Wildcat · Re-class to dev · Dry · Den norske stats oljeselskap a.s · Yme · PL 114
9/2-8 S is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jun 24, 1997, to 7,584 m in the Zechstein Gp.
Discovery 9/2-1 Yme · On the map →
- 7,584
- m total depth · 3,345 m vertical
- 93
- m water depth
- Jun 24, 1997
- entered · completed Feb 2, 1998
- Zechstein Gp
- at total depth · Late Permian
- 84.3
- m of core in 4 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED FEB 2, 2000
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- YME · Jack-up 3 legs
- Drilling days
- 203
- Kelly bushing elevation
- 42 m
- Maximum inclination
- 99°
- Drilling permit
- 895-L
- Licensing round
- 10-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 57.81877° N, 4.51972° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 9/2-8 S was drilled from slot 3 of the Yme template. The well was planned as an exploration well, to identify the hydrocarbon potential of the Yme Epsilon East and West structures. The well design was based on flexibility to enable later completion as a production well if commercial reserves of oil were encountered. The Epsilon East and West structures are developed on the east and west sides of a salt diapir. The well was planned to drill down through the sequence on the east flank with the Sandnes Formation being the primary target. As a secondary target the well was planned to extend a further 1600 m into Epsilon West structure. This involved drilling through the base of the salt diapir and then up through the sequence within the western flank. The Epsilon East structure was recognized as a fairly well defined prospect, comprising of an eastward dipping tilted fault block. Complicated tectonism affecting the Epsilon West structure however, meant this could only have the status of a lead. The main uncertainties with respect to probability of discovery were considered as leakage/trap and source/migration.
Operations and results
Wildcat well 9/2-8 S was spudded from the seabed with the jack-up installation "Mærsk Giant" on 24 June 1997. At 5936 m the BHA became stuck while drilling the Sandnes Formation. The well was subsequently sidetracked to 9/2-8S T2 from 5680 m on the 4 October 1997. The T2 sidetrack was only drilled to 6011 m due to the BHA becoming stuck at 6002 m while pulling out of hole. A further sidetrack, 9/2-8S T3, was drilled from 5628.5 m, on 19 October 1997 and reached a TD of 7203 m on 16 December 1997. This sidetrack failed to penetrate the Vestland Group, passing from Zechstein salts of the faulted zone straight into the shales of the Tau Formation. As a result a final sidetrack, 9/2-8S T4, was started from 6144 m on 21 December 1997. This wellbore reached final TD at 7584 m in the Late Jurassic Egersund formation on 18 January 1998 after
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.