6507/7-11 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by Conoco Norway Inc., entered Jun 25, 1997, to 3,749 m in the Åre Fm.

On the map →

3,749
m total depth · 3,744 m vertical
274
m water depth
Jun 25, 1997
entered · completed Aug 14, 1997
Åre Fm
at total depth · Early Jurassic
26.8
m of core in 1 core
127
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED AUG 14, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK JUTLANDER · Semisub steel
Drilling days
51
Kelly bushing elevation
23 m
Maximum inclination
7.80000019°
Drilling permit
897-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.30133° N, 7.12841° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6507/7-11 S was drilled to test a 3-way dip closed structure (Heidrun SW) between the Smørbukk Field to the southwest and the Heidrun Field to the northeast. The Heidrun SW prospect consists of a downthrown fault closure, W-segment and an independent up-thrown three way dip-closure; the SW-segment. The trap is a structural hanging wall trap, and formed as a consequence of Late Jurassic to Middle Cretaceous extensional tectonics. The prospect has a 3-way dip closure to the north, west and south and an up-thrown fault closure to the east, requiring a fault seal in order to have hydrocarbons present. The primary objective was to prove up commercial reserves for the Heidrun SW structure, by testing the hydrocarbon potential of the Middle Jurassic Fangst Group, by means of wire line logging and coring. Secondary objectives were to test the Early Jurassic Tilje and Åre reservoirs and the Early Cretaceous sandstones for Hydrocarbon potential. The flowing potential and productivity of a discovery, if made, should be evaluated by MDT and DST-tools. If no indications of hydrocarbons in Late Tilje were found, the well would reach TD at 3706 m TVD RKB (3710 m MD RKB) or 50 m below top Tilje Formation. If hydrocarbons were present, the well would reach TD deeper, at 3926 m TVD RKB (3930 mMD RKB) or 270 m below top Tilje.

Operations and results

Well 6507/7-11 S was spudded with the semi-submersible installation Mærsk Jutlander on 25 June 1997 and drilled to TD at 3749 m (3744 m TVD RKB) in the Early Jurassic Tilje Formation. The well was drilled with Seawater and hi-vis pills down to 754 m and with KCl glycol enhanced mud from 754 m to TD.

Nearly 40 m net thickness (of 100 m gross) of Fangst Group sandstones was encountered. Apart from elevated high background levels of mud gas in the interval 1500 m to 1540 m (7% to 11%) the well was practically devoid of hydrocarbon indications and the target reservoir zones in the Fangst and Båt

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3131, documented in the API reference.