NORWAY · WELLBORES · NPDID 3145

15/9-19 A

Exploration · Appraisal · P&A · Oil · Den norske stats oljeselskap a.s · Volve · PL 046

2 documents: reports, logs, and plots →

15/9-19 A is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jul 25, 1997, to 4,131 m in the Smith Bank Fm.

Discovery 15/9-19 S Volve · On the map →

4,131
m total depth · 3,319 m vertical
85
m water depth
Jul 25, 1997
entered · completed Nov 9, 1997
Smith Bank Fm
at total depth · Triassic
177
m of core in 7 cores
117
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED NOV 9, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BYFORD DOLPHIN · Semisub steel
Drilling days
108
Kelly bushing elevation
25 m
Maximum inclination
59°
Drilling permit
898-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.43590° N, 1.92974° E
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The well 15/9-19 SR on the Theta Vest structure North of the Sleipner East Field proved oil in the Hugin Formation in 1993. The objective for the well 15/9-19 A, a side-track from this well, was to confirm a minimum economic hydrocarbon volume in the Hugin Formation and map the extension of the oil-bearing formation.

General

The well 15/9-19 SR on the Theta Vest structure North of the Sleipner East Field proved oil in the Hugin Formation in 1993. The objective for the well 15/9-19 A, a side-track from this well, was to confirm a minimum economic hydrocarbon volume in the Hugin Formation and map the extension of the oil-bearing formation.

Operations and results

Well 15/9-19 A was kicked off from 2178 m in well bore 15/9-19 SR on 25 July 1997, using the semi-submersible installation Byford Dolphin. The well was drilled through the Skagerrak Formation and terminated approximately 30 m TVD into the Triassic Smith Bank Formation at 4131 m (3318.5 m TVD RKB). The final acquisition programme immediately after reaching the total depth of the well was strongly affected by a labour conflict, which delayed the well operations for 32.5 days. The originally planned open hole electric logging program had to be terminated and the 7" casing run to TD in order to secure the well. The later cased hole logging failed due to tool problems. The well was drilled oil based with the Ultidril mud system (oil base consists of synthetic olefins) from kick-off to TD.

Top of the Hugin Formation was penetrated at 3796.5 m (3015.5 m TVD RKB) approximately 60 m TVD deeper than prognosed. It was 153 m thick (TVD) and oil-bearing. The total oil column in the well was 80 m, but no clear oil-water contact was observed. The base of the reservoir was at 3919 m (-3126.5 m TVD RKB). Seven cores were cut in the interval 3838 m to 4017 m in the Hugin and Skagerrak Formations, with a total recovery of 177.6 m. One attempt was mad

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3145, documented in the API reference.