NORWAY · WELLBORES · NPDID 3166

6510/2-1

Exploration · Wildcat · Suspended · Shows · A/S Norske Shell · PL 214

5 documents: reports, logs, and plots →

6510/2-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by A/S Norske Shell, entered Aug 16, 1997, to 3,102 m in the Grey Beds (informal).

On the map →

3,102
m total depth · 3,102 m vertical
325
m water depth
Aug 16, 1997
entered · completed Oct 10, 1997
Grey Beds (informal)
at total depth · Triassic
26.5
m of core in 3 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED OCT 10, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK JUTLANDER · Semisub steel
Drilling days
56
Kelly bushing elevation
23 m
Maximum inclination
1.70000005°
Drilling permit
901-L
Licensing round
15
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.78767° N, 10.43093° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The main objective of well 6510/2-1 was to test the hydrocarbon potential of tidal to shoreface Lower Jurassic deposits in the "Vega" prospect, a large structure fault bounded to the East and South-East by the Ylvingen fault complex. Secondary objectives were Upper Permian shallow marine sand units expected to be sealed by Upper Permian source shales and Mid-Triassic aeolian sands sealed by Triassic Evaporites.

Operations and results

The well 6510/2-1 was spudded on 16 August 1997 with the semi-submersible installation "Mærsk Jutlander" and reached a total depth of 4700 m in shales of Early Triassic age. It was drilled with seawater and bentonite with hi-vis pills from the surface to 1210 m and with BARASILC sodium silicate mud from 1210 m to 2926 m. From 2926 m to TD the Sodium silicate mud was gradually depleted to a glycol enhanced mud (GEM). At 3102 m the well was suspended and the rig taken to Kristiansund for repair due to riser tensioner difficulties. Further problems with the acoustic BOP control system caused a total 53 days delay before well 6510/2-1 R was re-entered.

Formation tops were penetrated within the prognosed range, except for the Top Permian, which was not encountered. The well found the Lower Jurassic to be developed in a more proximal facies than anticipated, possibly an intra tidal plain deposit. The sequence was predominantly shales, with interbedded coal layers and a few thin sandy intervals. Weak hydrocarbon shows were recorded intermittently in the Lower Jurassic sequence, but logs, core material and sidewall samples show the reservoir intervals to be water bearing. Sand development in the Mid Triassic objective below the evaporites was also poor with no hydrocarbon indications. The Permian was not penetrated, and the Triassic sequence was found to be much thicker than expected. The well reached a total depth of 4707 m in shales of Early Triassic age. The well TD commitment wa

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.