NORWAY · WELLBORES · NPDID 3176

30/3-7 A

Exploration · Wildcat · P&A · Gas/condensate · Den norske stats oljeselskap a.s · Veslefrikk · PL 052

5 documents: reports, logs, and plots →

30/3-7 A is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Oct 13, 1997, to 6,678 m in the Drake Fm.

Discovery 30/3-7 A · On the map →

6,678
m total depth · 4,181 m vertical
175
m water depth
Oct 13, 1997
entered · completed Jan 29, 1998
Drake Fm
at total depth · Early Jurassic
13.4
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JAN 29, 2000

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VESLEFRIKK A · Jacket 4 legs
Drilling days
95
Kelly bushing elevation
56 m
Maximum inclination
73.90000153°
Drilling permit
903-L
Licensing round
4
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.78277° N, 2.89776° E
Hydrocarbons in
Brent Gp · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/3-7 A was drilled on the Veslefrikk Field. The primary objective of the well was to explore the sand potential and possible hydrocarbons in the Late Jurassic sequence west of the Veslefrikk Field (the K-prospect). Well 30/7-3 S, was drilled on the same prospect in 1995, but did not reach the prospect due to an unforeseen fault system. A secondary objective was to drill through the Brent Group of the B-prospect, as a pilot well for a second sidetrack, the 30/3-7B well.

Operations and results

Wildcat well 30/3-7 A was drilled as a sidetrack to well 30/3-7 S, from the fixed surface installation Veslefrikk A. It was first kicked off through the 9 5/8" casing at 3459 - 3462 m in the primary well bore on 13 October 1997. The mill got stuck in the window and the string had to be backed off. A cement plug was set above the fish and a second window was milled from 3336 m to 3340 m. Due to possible high pressure scenarios above the strongly faulted complex penetrated by well bore 30/7-3 S it was decided to run and cement a 7" liner at 5705 m and the bottom part of the well was drilled as a 6" hole. A number of problems mainly related to kick-off, MWD, and logging at high temperatures (in excess of 150 deg C), led to 111 days spent on the well compared to the planned 33.5 days. The well was drilled to final TD at 6678 m in the Early Jurassic Drake Formation. The mud used was Ultidril, a pseudo-oil based mud system where the oil base is synthetic oil (olefines).

The K-prospect was found to consist of well-cemented, fine grained and silty non-reservoir sandstones of Turonian to Coniacian age. There were no recoverable hydrocarbons in this zone. The Base Cretaceous level came in 180 m deeper than prognosed, and the Brent Group came in 168 m deeper than prognosed, whereas the Etive Formation was spot on prognosis. The Tarbert and Ness Formations were thinner, and the base Brent sand (Oseberg Informal Formation) wa

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3176, documented in the API reference.