NORWAY · WELLBORES · NPDID 321

15/8-1

Exploration · Wildcat · P&A · Gas/condensate · Den norske stats oljeselskap a.s · Utgard · PL 046

38 documents: reports, logs, and plots →

15/8-1 is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jul 18, 1981, to 4,300 m in the Rattray Fm.

Discovery 15/8-1 Utgard · On the map →

4,300
m total depth · 4,299 m vertical
112
m water depth
Jul 18, 1981
entered · completed Jan 7, 1982
Rattray Fm
at total depth · Middle Jurassic
46.7
m of core in 5 cores
141
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JAN 7, 1984

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
GLOMAR BISCAY II · Semisub steel
Drilling days
174
Kelly bushing elevation
25 m
Maximum inclination
2.5°
Drilling permit
298-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.36336° N, 1.57286° E
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 15/8-1 was drilled west of the Sleipner field, ca 2 km from the UK border. The well was designed to test possible hydrocarbon accumulation in the sandstones of middle Jurassic age.

Operations and results

Wildcat well 15/8-1 was spudded with the semi-submersible installation Glomar Biscay II on 18 July 1981 and drilled to TD at 4300 m in the Middle Jurassic Fladen Group. Drilling operations were performed without significant problems in the 36", 26" and 17 1/2" holes. Pipe stuck in the 12 1/4" hole at 2254 m and several times in the 8 1/2" hole. Miscellaneous technical problems occurred while drilling the 6" hole and a gas kick was at 4265 m while tripping. The well was drilled with seawater and gel down to 500 m and with gypsum mud from 500 m to 2890 m. Lignosulphonate was added from 1570 m, and from 2890 m to TD the gypsum mud was gradually depleted and replaced with a gel/lignosulphonate mud.

The well 15/8-1 proved gas and condensate in sandstone of Middle Jurassic age. The gas/water contact was indicated at 3698 m from the Formation Multi Tester. Oil shows were recorded from 3065 m to 3075 m in the Hod Formation. Five conventional cores were cut in the interval 3658 m to 3705.5 m in the Hugin Formation. Three samples were attempted taken during FMT runs. Due to technical malfunctions only 1 sample (from 3668 m) was obtained.

The well was permanently abandoned on 7 January 1982 as a gas/condensate discovery.

Testing

One drill stem test was performed in the Sleipner formation and three in the Hugin Formation. The procedure of the tests was similar; after initial flow and build up the well was flowed for approximately 660 min. producing gas/condensate. Test no. 4 was only flowed for 480 minutes. CO2 was produced in all tests, in concentrations ranging from 4% to 15%, and up to 8 ppm H2S was recorded in DST2. Two sets of PVT samples were taken

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/321, documented in the API reference.