NORWAY · WELLBORES · NPDID 3214

34/7-27

Exploration · Wildcat · P&A · Dry · Mobil Exploration Norway INC · PL 089

5 documents: reports, logs, and plots →

34/7-27 is a wildcat exploration wellbore in the North Sea, drilled by Mobil Exploration Norway INC, entered Sep 1, 1998, to 3,000 m in the Drake Fm.

On the map →

3,000
m total depth · 3,000 m vertical
311
m water depth
Sep 1, 1998
entered · completed Oct 7, 1998
Drake Fm
at total depth · Early Jurassic
14.4
m of core in 1 core
103
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED OCT 7, 2000

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BYFORD DOLPHIN · Semisub steel
Drilling days
37
Kelly bushing elevation
25 m
Maximum inclination
2.48000002°
Drilling permit
933-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.49225° N, 2.00583° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/7-27 was drilled in the northwestern corner of block 34/7, north of the Sygna and Statfjord North fields. The project was a joint operation involving three licence groups, PL 089, PL 206, and PL 037.

The prospect was the Nordis Nord prospect, which was located immediately to the north of, and in a down flank position from, the Sygna (Nordis) discovery made in wells 33/9-19 S&A (PL 037). The Nordis Nord prospect was defined as a combined structural and stratigraphic trap where the expected hydrocarbon phase was oil.

The main purpose of well 34/7-27 was to test the lithology and presence of hydrocarbons within the sandstone formations of the Brent Group. A secondary purpose of the well was to test a target in the Upper Jurassic, Draupne Formation and obtain pressure measurements in the Upper Jurassic and Brent to identify hydrocarbon communication in the area.

Operations and results

The wildcat well 34/7-27 was drilled with the semi-submersible installation "Byford Dolphin". The well was spudded on 1 September 1998 but, following problems running the 30"; casing, was respudded on 3 September and the well reached TD on 29 September 1998 at 3000 m in the Early Jurassic Drake Formation. The well was drilled with seawater and viscous sweeps down to 905 m and with water based silicate mud ("Barasilc") from 915 m to TD. Sands were encountered in the prospective levels. The well penetrated a 153 m thick Brent Group sequence (2777 - 2930 m) with excellent reservoir properties in the Etive Formation, reaching 28.7 % porosity and 2100 mD in the upper part. The well encountered no hydrocarbons. All penetrated sequences proved to be water filled with no shows. One core was cut in the Draupne and uppermost Heather formation (2742 - 2759 m). No fluid sampling was attempted. Well 34/7-27 was plugged and abandoned as a dry well on 7 October 1998.

Testing

No drill stem test was performed

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3214, documented in the API reference.