NORWAY · WELLBORES · NPDID 324
15/9-3
Exploration · Appraisal · P&A · Shows · Den norske stats oljeselskap a.s · Sleipner Vest · PL 046
15/9-3 is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Dec 17, 1978, to 3,796 m in the Skagerrak Fm.
Discovery 15/6-3 Sleipner Vest · On the map →
- 3,796
- m total depth
- 115
- m water depth
- Dec 17, 1978
- entered · completed Apr 3, 1979
- Skagerrak Fm
- at total depth · Triassic
- 68
- m of core in 4 cores
- 107
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 3, 1981
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ROSS RIG (1) · Semisub steel
- Drilling days
- 108
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 0°
- Drilling permit
- 206-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.48612° N, 1.69402° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well was drilled on the northwestern part of the Sleipner Vest structure in the Viking Graben of the North Sea. The objective was to test hydrocarbons in the “Alpha structure” of the Sleipner field. The target was Middle Jurassic sandstones.
Operations and results
Appraisal well 15/9-3 was spudded with the semi-submersible installation Ross Rig on 17 December 1978 and drilled to TD at 3796 m in the Triassic Skagerrak Formation. Many problems were encountered in the operations. When drilling the 26" interval, the circulation was lost several times. Pumping lost circulation material pills and cement into the formation solved this. The main problem arose when drilling the 8 1/2” interval. At 3375 m on top of Upper Jurassic, an abnormally pressured impermeable zone was penetrated. Due to a series of technical problems that followed this incident, the well was finally plugged back and sidetracked from 1213 m. Furthermore, the well was drilled in the wintertime and the cold was quite severe. Because of this, the hydraulic control system for the BOP stack froze on one occasion. Functional problems with the BOP pods were experienced, consequently, the time and cost estimates, were seriously exceeded. The well was drilled with spud mud down to 402 m, with gel/lignosulphonate from 402 m to 2680 m and with gel/lignosulphonate/lignite mud from 2680 m to TD.
The Middle Jurassic Vestland Group, top Hugin Formation, was encountered at 3498 m. Well 15/9-3 proved very poor reservoir qualities in these strata and the well was hence not production tested. A cluster of RFT pressure data points suggested a light hydrocarbon gradient of 0.11 - 0.25 psi/ft. between 3600 m and 3612 m. Between 3650 m and 3682 m a good "heavier" hydro
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/324, documented in the API reference.