NORWAY · WELLBORES · NPDID 325
15/9-4
Exploration · Appraisal · P&A · Gas/condensate · Den norske stats oljeselskap a.s · Sleipner Vest · PL 046
15/9-4 is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Apr 4, 1979, to 3,716 m in the Skagerrak Fm.
Discovery 15/6-3 Sleipner Vest · On the map →
- 3,716
- m total depth · 3,716 m vertical
- 102
- m water depth
- Apr 4, 1979
- entered · completed Jun 14, 1979
- Skagerrak Fm
- at total depth · Triassic
- 150.1
- m of core in 9 cores
- 112
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 14, 1981
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ROSS RIG (1) · Semisub steel
- Drilling days
- 72
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 1.89999998°
- Drilling permit
- 213-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.40007° N, 1.78526° E
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 15/9-4 was drilled on in the southeastern part of the Sleipner Vest area in the Viking Graben of the North Sea. Previously four wells had been drilled on the Sleipner Alpha structure in the north. Two of these showed significant gas-condensate accumulations (15/6-3 and 15/9-1) in the middle Jurassic while in the western part of the Alpha structure the sand had shaled out (15/9-3). In the northeast, the sand was penetrated below the hydrocarbon/water contact (15/6-5). The first well drilled on the Beta prospect (15/9-2) showed a significant gas-condensate column in the middle Jurassic sand. The primary objective for well 15/9-4 was to test possible hydrocarbons in Middle Jurassic sandstones in the southeast extending Delta structure.
Operations and results
Well 15/9-4 was spudded with the semi-submersible installation Ross Rig on 4 April 1979 and drilled to TD at 3716 m in the Triassic Skagerrak Formation. Very few problems were encountered during drilling of this well, with the exception of lost circulation in the 26" interval. This problem was solved by pumping cement into the formation. The main problem arose only after drilling the 8 1/2” interval. The 7" liner was run and cemented sucessfully. When pressure was applied in order to test the liner lap, the 9 5/8" casing burst. The well was drilled with spud mud down to 415 m and with gel/lignosulphonate mud from 402 m to TD.
Top of the Middle Jurassic Vestland Group, Hugin Formation was penetrated at 3441 m. The section contained sandstones with good reservoir properties interbedded with some thin shale beds. The sandstones were hydrocarbon bearing with a gas-water contact at ca 3570 m, 7 m into the Sleipner Formation. Weak oil shows were described t
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/325, documented in the API reference.