NORWAY · WELLBORES · NPDID 3253

31/6-A-24

Development · Production · Producing · Gas · Den norske stats oljeselskap a.s · Troll · PL 085

31/6-A-24 is a production development wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Dec 25, 1997, to 1,667 m.

Discovery 31/6-1 (Troll Øst) · On the map →

1,667
m total depth · 1,486 m vertical
303.4
m water depth
Dec 25, 1997
entered · completed Oct 17, 1998
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 17, 2026 · RELEASED OCT 17, 2000

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
TROLL A · Condeep 4 shafts
Drilling days
17
Kelly bushing elevation
58.6 m
Maximum inclination
—°
Drilling permit
1375-P
Licensing round
Awarded additionally to round 7
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
60.64551° N, 3.72645° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3253, documented in the API reference.