NORWAY · WELLBORES · NPDID 3257
1/5-3 S
Exploration · Wildcat · P&A · Oil · Conoco Norway Inc. · PL 144
1/5-3 S is a wildcat exploration wellbore in the North Sea, drilled by Conoco Norway Inc., entered Jun 10, 1998, to 1,565 m in the Hordaland Gp.
Discovery 1/5-3 S · On the map →
- 1,565
- m total depth · 1,565 m vertical
- 69
- m water depth
- Jun 10, 1998
- entered · completed Aug 6, 1998
- Hordaland Gp
- at total depth · Miocene
- —
- m of core
- 54
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 6, 2000
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- BYFORD DOLPHIN · Semisub steel
- Drilling days
- 57
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 5.69999981°
- Drilling permit
- 918-L
- Licensing round
- 12
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.69014° N, 2.61504° E
- Hydrocarbons in
- No Formal Name · Miocene
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Block 1/5 is situated in the Norwegian Central Trough at the transition of the Feda Graben and the Breiflabb Basin. Well 1/5-3 S was planned as an exploration well with TD at 2910 m in the Tor Chalk Formation. The well was positioned in a seismically defined "gas chimney" on the crest of a salt induced diapir and was the first well drilled on this diapir. Similar cases have been drilled successfully by STATOIL on the Tommeliten Discovery 1/9-2 and 1/9-3 wells. The primary objective of well 1/5-3 S was to test the presence of moveable hydrocarbons in fractured, reservoir quality chalk of the Ekofisk and Tor formations along the southwestern flank of the diapir. A secondary potential objective was in the Paleocene Rogaland Group. A total depth of 1566 m was reached in the 12 1/4" hole section on June 29, 1998 before deciding to permanently abandon the well due to increasing pore pressure, without fulfilling any of the well objectives.
Operations and results
Exploration 1/5-3 S well was spudded with the semi-submersible "Byford Dolphin" on 10 June 1998 and drilled to TD at 1566 m in rocks of Late Miocene age (undifferentiated Nordland Group). The well was drilled with seawater and hi-vis pills down to 792 m and with Baroid "BARASILC" silicate / KCl glycol enhanced ("GEM GP") mud from 792 m to TD. Due to possible shallow gas hazard at 466 m, a 9 7/8" pilot hole was drilled below the 30" conductor to 780 m. The 9 7/8" hole was opened up to 26" at 792 m prior to setting 20" casing at 785 m. No shallow gas was observed from the MWD resistivity in this hole section.
Record setting overpressures were experienced in the 17 1/2" hole section in well 1/5-3 S. Abnormal pressures were indicated first at 700 - 800 m. Pore pressures built quickly to 1.4 g/cc due to gas just below 1000 m in. Having passed that depth, the hole drilled without problems until below 1200
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/3257, documented in the API reference.