NORWAY · WELLBORES · NPDID 326
15/9-5
Exploration · Appraisal · P&A · Gas/condensate · Den norske stats oljeselskap a.s · Sleipner Vest · PL 046
15/9-5 is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Nov 19, 1979, to 3,946 m in the Skagerrak Fm.
Discovery 15/6-3 Sleipner Vest · On the map →
- 3,946
- m total depth · 3,945 m vertical
- 108
- m water depth
- Nov 19, 1979
- entered · completed Apr 11, 1980
- Skagerrak Fm
- at total depth · Triassic
- 134.4
- m of core in 9 cores
- 131
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 11, 1982
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORSKALD · Semisub steel
- Drilling days
- 145
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 2.25°
- Drilling permit
- 232-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.40346° N, 1.70811° E
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 15/9-5 was drilled in the Sleipner Vest area in the Central Graben of the North Sea. The objective was to test hydrocarbons in Middle Jurassic sandstones in the Beta structure of Sleipner Vest. The well is Reference Well for the Heimdal and Våle formations.
Operations and results
Appraisal well 15/9-5 was spudded with the semi-submersible installation Norskald on 19 November 1979 and drilled to TD at 3946 m in the Triassic Skagerrak Formation. Operations met with many problems, but the well objectives were fulfilled in the end. Excessive drag when pulling core barrel out of reservoir was a severe problem, and consequently frequent reaming and circulating trips was needed. Having finished logging in the 8 1/2” section, and just started testing the BOP stack, one of the riser tension sheaves broke and fell down. Also several problems with the hydraulic BOP control system and the ball joint made nearly 12 days rig repair necessary. After this delay the hole required extensive reaming before the 7” liner could be ran and the final 6” section could be drilled. Testing operations were hampered and delayed by bad weather and test equipment breakdown. The well was drilled with spud mud down to 426 m and with seawater/lignosulphonate mud from 426 m to TD.
The well proved gas in sandstones of Middle Jurassic age from top Hugin Formation at 3526 m down to a true gas/water contact at 3662 m, based on logs and RFT samples. The Sleipner Formation was encountered at 3693 m. Logs and RFT pressure gradient proved Sleipner water filled, and ca 3 bar overpressured compared to the Hugin Formation. Shows were described on cores all through the hydrocarbon bearing reservoir. Abundant spots of fluorescence described on cuttings below ca 2000
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.