NORWAY · WELLBORES · NPDID 330

15/9-12

Exploration · Appraisal · Suspended · Gas/condensate · Den norske stats oljeselskap a.s · Sleipner Vest · PL 046

4 documents: reports, logs, and plots →

15/9-12 is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Nov 22, 1981, to 3,740 m in the Sleipner Fm.

Discovery 15/6-3 Sleipner Vest · On the map →

3,740
m total depth · 3,739 m vertical
110
m water depth
Nov 22, 1981
entered · completed Feb 27, 1982
Sleipner Fm
at total depth · Middle Jurassic
168.1
m of core in 11 cores
112
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 27, 1984

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
NORDRAUG · Semisub steel
Drilling days
98
Kelly bushing elevation
25 m
Maximum inclination
4.19999981°
Drilling permit
309-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.45644° N, 1.71778° E
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/9-12 was drilled as an appraisal well on the saddle area between the Alpha and Beta structures on the Sleipner Vest field in the North Sea. The main objective was to test the Middle Jurassic sandstones.

Operations and results

After setting anchors on 8 November 1981 the spud was delayed two weeks due to strike by the maritime and drilling crews.

Appraisal well 15/9-12 was spudded with the semi-submersible installation Nordraug on 22 November 1981 and drilled to TD at 3740 m in the Middle Jurassic Sleipner Formation. The 36" hole was drilled to 195 m but due to bad weather the hole was lost and the well was re-spudded on 26 November. Drilling of the 26" and 17 1/2" holes went forth without significant problems other than tight spots in the lower part of the 17 1/2" hole. When setting the 9 the 5/8" casing shoe at 2755 m 64 m3 mud was lost to the formation. The well was drilled with seawater and gel slugs down to 501 m, with gel-lignosulphonate mud from 501 m to 1135 m, with lignosulphonate/gypsum/CMC mud from 1135 m to 2771 m, and with gel-lignosulphonate mud from 2771 to 3740 m.

A 251 m thick Heimdal Formation was penetrated from 2374 m to 2625 m. The Heimdal Formation was water bearing without shows. The primary target reservoir Hugin Formation was penetrated at 3510 m and proved to contain gas-condensate with a gas-water contact at 3654 according to RFT pressure gradients. Weak shows continued on the cores down to 3665 m. The underlying Sleipner Formation was dry without shows.

A total of 168.8 m core was cut from top to base of the Hugin Formation. The depth for cores 1 - 9 should be sh

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/330, documented in the API reference.