NORWAY · WELLBORES · NPDID 344

24/9-1

Exploration · Wildcat · P&A · Dry · Conoco Norway Inc. · PL 039

7 documents: reports, logs, and plots →

24/9-1 is a wildcat exploration wellbore in the North Sea, drilled by Conoco Norway Inc., entered Feb 29, 1976, to 4,907 m in the Heather Fm.

On the map →

4,907
m total depth
118
m water depth
Feb 29, 1976
entered · completed Jul 3, 1976
Heather Fm
at total depth · Late Jurassic
18.2
m of core in 1 core
127
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 3, 1978

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ROSS RIG (1) · Semisub steel
Drilling days
126
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
152-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
59.26930° N, 1.79199° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 24/9-1 is located in the Vana Sub-basin in the Southern Viking Graben, about 11 km east of the border to British sector. The well was drilled to test a large, dip-closed structure located in the centre of the Viking Graben. The target was Late Jurassic sandstones. Two sandstone intervals were expected in the well, with a possible gross thickness of about 250-300 m. The prognosis was based on a correlation with the UK wells 16/7-1, 16/8-1 and the Norwegian well 15/3-1 which are situated in a similar position as 24/9-1 relative to the eastern boundary fault of the Viking Graben.

The well is Reference Well for the Svarte, Tryggvason, Kyrre, and Jorsalfare Formations.

Operations and results

Well 24/9-1 was spudded with the semi-submersible installation Ross Rig on 29 February 1976 and drilled to TD at 4907 m in the Late Jurassic Heather Formation. Below the 20" casing at 758.3 m the Formations drilled contained abundant sand and was drilled extremely fast. This created problems as the solids removal system on the rig was incapable of removing the sand as fast as it was drilled. In addition the polymer mud system chosen did not provide sufficient fluid loss control in the porous formation and large amounts of fluids were lost to the formation. From ca 2440 m to TD at 2752 m in the 17 1/2" hole low penetration rates was a problem. Of 126 rig days 20 % was counted as lost time, but the total time spent on the well was still less than the originally estimated 139 days. Problems related to tight/sloughing hole and down hole tool failure accounted for roughly half of the lost time. The well was drilled with seawater down to 256 m, with lime / lignosulphonate from 256 m to 3983 m, with Dextrid / Lignosulphonate from 3983 m to 4613 m, and with lime / lignosulphonate from 4613 m to TD.

Tertiary sandstones were encountered in the Grid Formation (1131 m to 1420 m), The Heimdal Formation (2202 m to 2497

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.