NORWAY · WELLBORES · NPDID 3524
35/9-4 S
Exploration · Appraisal · Junked · Not applicable · Norsk Hydro Produksjon AS · Gjøa · PL 153
35/9-4 S is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jul 13, 1998, to 1,261 m in the Lista Fm.
Discovery 35/9-2 · On the map →
- 1,261
- m total depth · 1,261 m vertical
- 364
- m water depth
- Jul 13, 1998
- entered · completed Aug 12, 1998
- Lista Fm
- at total depth · Paleocene
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 12, 2000
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN LEADER · Semisub steel
- Drilling days
- 31
- Kelly bushing elevation
- 23.5 m
- Maximum inclination
- 0°
- Drilling permit
- 930-L
- Licensing round
- 12
- Plugged and abandoned
- Aug 12, 1998
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 61.32569° N, 3.96534° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 35/9-4 S was the sixth exploration well in the license and should appraise the hydrocarbon potential of the A South structure on the Gj øa Discovery. The primary target was sands of the Sognefjord and Fensfjord Formations, which were expected to be in full internal communication and with common fluid contacts.
Operations and results
Well 35/9-4 S was spudded with the semi-submersible installation Transocean Leader on 13 July 1998 and drilled to TD at 1261 m in the Paleocene Lista Formation. A 36" hole was drilled to 451 m, and the 30" conductor set at 449 m. The 17 1/2" hole section was drilled riserless to 1261 m. During running of the 13 3/8" casing, water flow was observed in the wellhead area. The casing was set at 1255.5 m, and the riser and BOP were installed. The water flow increased in magnitude and amount, and a successful killing operation was carried out. The well was drilled with seawater and hi-vis pills from top to TD.
The well objective was not fulfilled as the well was terminated due to the shallow water flow. The source of the shallow water flow was found to be a quaternary sand-rich interval between 559 m and 600 m, and with a significant contribution from an intra Lista Formation sand at 903 m. No cores were cut and no fluid samples taken in the well.
The well was permanently abandoned on 12 August 1998 as a junked well.
Testing
No drill stem test was performed
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/3524, documented in the API reference.