NORWAY · WELLBORES · NPDID 361

25/4-3

Exploration · Wildcat · P&A · Oil/gas · Elf Petroleum Norge AS · Alvheim · PL 036

5 documents: reports, logs, and plots →

25/4-3 is a wildcat exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Oct 13, 1974, to 2,714 m in the Jorsalfare Fm.

Discovery 25/4-3 (Gekko) · On the map →

2,714
m total depth
121
m water depth
Oct 13, 1974
entered · completed Nov 22, 1974
Jorsalfare Fm
at total depth · Late Cretaceous
10.5
m of core in 3 cores
70
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED NOV 22, 1976

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA DRILLER · Semisub steel
Drilling days
41
Kelly bushing elevation
25.5 m
Maximum inclination
0°
Drilling permit
119-L
Licensing round
2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.51228° N, 2.09136° E
Hydrocarbons in
Heimdal Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The well 25/4-3 is located SW of the Heimdal field on a Paleocene structure which trends NE-SW and stretches southwards over the block 25/7. The Heimdal sand formation was the main objective with a bright spot phenomenon clearly visible on all the seismic sections through the structure. Seismic mapped vertical closure was assumed to be less than 50 m. Danian sands was the secondary target.

Operations and results

Wildcat well 25/4-3 was spudded with the semi-submersible installation Deepsea Driller on 13 October 1974 and drilled to TD at 2714 m in the Late Cretaceous Jorsalfare Formation.

The tuff marker was encountered at 1974 m, 20 m lower than prognosed. Heimdal sands expected around 2075 m were found at 2125 m. The Heimdal sand contained 3 m gas down to a gas/oil contact at 2128 m and 5 m oil down to a oil/water contact at 2133 m. A 94 m thick sequence of Danian sands (Ty Formation) was encountered at 2550 m overlying Late Cretaceous chalky limestones.

Three cores were cut in the Heimdal sands from 2128 m to 2144 m. Three Formation Interval Tests were conducted on the interval 2125 - 2133 m. FIT 1 and 3 at 2126.2 and 2126.4 m were unsuccessful due to mechanical failures. FIT 2 at 2129.7 recovered oil and mud filtrate.

The well was permanently abandoned on 22 November 1974 as an oil and gas discovery.

Testing

No drill stem test was performed in the well.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/361, documented in the API reference.