NORWAY · WELLBORES · NPDID 3648
2/1-12
Exploration · Wildcat · P&A · Dry · BP Norway Limited U.A. · PL 019 C
2/1-12 is a wildcat exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Jan 8, 1999, to 3,550 m in the Bryne Fm.
- 3,550
- m total depth · 3,550 m vertical
- 68
- m water depth
- Jan 8, 1999
- entered · completed Feb 10, 1999
- Bryne Fm
- at total depth · Middle Jurassic
- —
- m of core
- 125
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 10, 2001
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MÆRSK JUTLANDER · Semisub steel
- Drilling days
- 34
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 1.39999998°
- Drilling permit
- 946-L
- Licensing round
- 1-A
- Plugged and abandoned
- Feb 10, 1999
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.87036° N, 3.31290° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
In September of 1998 BP Norge became operator of the PL 019C licence. The 2/1-12 well was the first well in the licence. The main prospect was the Upper Jurassic Ula Formation. The prospect was prognosed as a four-way dip closure, sealed by Upper Jurassic mudstones. Secondary targets were provided by the Vale Formation sandstones (Tertiary) and by limestones of the Tor Formation (Cretaceous). Well control was provided by the Saga operated wells 2/2-2 (1982) and 2/2-5 (1992) and by the BP well 2/1-5 (1982).
Operations and results
Wildcat well 2/1-12 was spudded with the semi-submersible installation "Maersk Jutlander" on 8 January 1999 and reached a Total Depth of 3550.0 m on the 31st January 1999 in sediments of the Middle Jurassic Bryne Formation. A 12 1/4" pilot hole was drilled to 950 m and logged with the CDR tool and was then opened to 17 1/2". No indications of shallow gas were observed on logs.
At 2808 m, the well was shut in due to a 300 bbl water influx. Shut-in drill pipe pressure was 225 psi and Shut-in casing pressure 345psi. The influx was circulated out with 1.60 sg mud. Analysis of the DxC Exponent and sonic logs shows that the pore pressure was risen to 1.53 sg in the mudstone sequence overlying the Lista Formation at 2704 m. Drilling continued until a flow check was performed at a negative drill break and the well was found to be flowing.
At 3133 m a crack was noticed in the shaft of the top drive. The bit was pulled into the 9 5/8" casing and repairs were undertaken. These repairs required the well to be static for 42 hrs. After the repairs were completed, circulation was established and after 30 minutes of circulation gas increased to 41.2% and dark brown oil was observed over the shakers and in the header box. No shows were seen in the cuttings or in the electrical logs. Geochemical analysis of a sample of the oil showed it to be similar to the Gyda oil. The well was drilled entirely water
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/3648, documented in the API reference.