NORWAY · WELLBORES · NPDID 375

29/6-1

Exploration · Wildcat · P&A · Gas/condensate · BP Norway Limited U.A. · Martin Linge · PL 043

18 documents: reports, logs, and plots →

29/6-1 is a wildcat exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Oct 12, 1981, to 4,832 m in the Lunde Fm.

Discovery 29/6-1 · On the map →

4,832
m total depth · 4,785 m vertical
124.7
m water depth
Oct 12, 1981
entered · completed May 9, 1982
Lunde Fm
at total depth · Late Triassic
120.1
m of core in 7 cores
166
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 9, 1984

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SEDCO 707 · Semisub steel
Drilling days
210
Kelly bushing elevation
24 m
Maximum inclination
25.29999924°
Drilling permit
307-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.53832° N, 1.99001° E
Hydrocarbons in
Brent Gp · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 29/6-1 was drilled ca 2 km west of the UK border on the eastern margin of the East Shetland Basin. The primary objective was the Brent Group in a fault block separate from the Hild structure some few km to the southwest. The secondary objective was the Statfjord formation.

Operations and results

Wildcat well 29/6-1 was spudded with the semi-submersible installation SEDCO 707 on and drilled to TD at 4832 m.

The well was spudded by "Sedco 707" on 12.10.81. When drilling the 17 1/2" pilot hole (with 1.1 sg mud) in the 24" section, mud losses occurred at 870 m. The hole was displaced to seawater and operations continued down to 1205 m where the 24" casing was set. Further drilling went with increasing mud weights due to tight hole problems, to a point where the overbalance considerably reduced penetration rate. Due to high deviation the pipe became differentially stuck at 4664 m. The well was planned to be vertical, but ended up severely deviated. From 3973 m to 4097 m hole inclination increased from 5 degrees to 10.5 degrees, increasing to 15.5 degrees by 4155 m, as a result of the increased dip of the bedding planes. At 4155 m a pendulum drill assembly was used but the hole inclination continued to increase to 19.5 degrees. By 4211 m the angle had reduced to 17 degrees but again increased to a maximum of 21 degrees by 4457 m, and then decreased to 20.25 degrees by 4570 m. Below this depth, surveys were not possible due to the hole conditions with overpull and stuck pipe on the connections and tight hole on trips. Keyseating, washout in the sandstones and the swelling nature of the clays in the Dunlin formation added to the problem caused by hole angle. At TD Schlumberger HDT log was run and the

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.