NORWAY · WELLBORES · NPDID 387

30/7-4

Exploration · Wildcat · Junked · Not applicable · Norsk Hydro Produksjon AS · PL 040

7 documents: reports, logs, and plots →

30/7-4 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jan 25, 1977, to 778 m in the Nordland Gp.

On the map →

778
m total depth
117
m water depth
Jan 25, 1977
entered · completed Feb 5, 1977
Nordland Gp
at total depth · Miocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 5, 1979

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLYGLOMAR DRILLER · Semisub steel
Drilling days
12
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
170-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.49159° N, 2.05676° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/7-4 is located in the eastern part of the East Shetland Basin in the North Sea. The well location is due west of the Oseberg Field and ca 2.5 km from the UK Border. The main objective of the well was to test Middle and Early Jurassic sandstones (Brent Group and Statfjord Formation) Secondary objectives were possible lower Cretaceous carbonate development, and possible Late Jurassic sandstones.

Operations and results

Well 30/7-4 was spudded with the semi-submersible installation Polyglomar Drilling on 25 January 1977. A 17 1/2" pilot hole was drilled to 192 m. The operation had to be suspended for two days due to bad weather. When the operation was continued, the 17 1/2" pilot hole could not be found and a new 36" hole was drilled. The 30" casing was set and cemented at 193 m. The weather conditions made it necessary to set piggy backs on five anchors. A 17 1/2" hole was drilled to 778 m in assumed Miocene sediments. This was the planned setting depth for the 20" casing. While reaming out the 17 1/2" hole to 26" prior to running 20" casing, the drill string parted. An overshot was worked over the fish but attempts to pull the fish were unsuccessful. The string was backed off at 538 m in the x-over above the overshot and the hole was given up. The well was drilled with seawater and gel.

No cores were cut, no logs were run, and no wire line fluid samples were taken.

The well was permanently abandoned on 5 February as a junk well and the rig was prepared for spudding replacement well 30/7-5.

Testing

No drill stem test

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/387, documented in the API reference.