NORWAY · WELLBORES · NPDID 388

30/7-5

Exploration · Wildcat · Junked · Not applicable · Norsk Hydro Produksjon AS · PL 040

7 documents: reports, logs, and plots →

30/7-5 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Feb 5, 1977, to 805 m in the Nordland Gp.

On the map →

805
m total depth
117
m water depth
Feb 5, 1977
entered · completed Feb 13, 1977
Nordland Gp
at total depth · Miocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 13, 1979

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLYGLOMAR DRILLER · Semisub steel
Drilling days
9
Kelly bushing elevation
24 m
Maximum inclination
1.20000005°
Drilling permit
172-L
Licensing round
3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.49172° N, 2.05761° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/7-5 was a replacement of the well 30/7-4 which was lost due to "twist off" of the drill pipe. The well is located in the eastern part of the East Shetland Basin in the North Sea. The well location is due west of the Oseberg Field and ca 2.5 km from the UK Border. The main objective of the well was to test Middle and Early Jurassic sandstones (Brent Group and Statfjord Formation) Secondary objectives were possible lower Cretaceous carbonate development, and possible Late Jurassic sandstones.

Operations and results

The semi-submersible installation Polyglomar Drilling was skidded over from the junked 30/7-4 well to the position for 30/7-5 by regulating the length of the anchor chains. Well 30/7-5 was spudded with on 5 February 1977 and drilled the 26" section to TD at 805 m in Miocene sediments. When running the 20" casing, the string parted and 18 joints of casing were left in the hole. Attempts to catch the fish failed and the well was given up. The well was drilled with seawater and gel.

No cores were cut, no logs were run, and no wire line fluid samples were taken.

The well was permanently abandoned on 13 February 1977 as a junk well, and the rig was prepared for spudding replacement well 30/7-6.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/388, documented in the API reference.