NORWAY · WELLBORES · NPDID 389
30/7-6
Exploration · Wildcat · Suspended · Shows · Norsk Hydro Produksjon AS · PL 040
30/7-6 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Feb 15, 1977, to 3,784 m in the Heather Fm.
- 3,784
- m total depth
- 116
- m water depth
- Feb 15, 1977
- entered · completed Jul 31, 1977
- Heather Fm
- at total depth · Late Jurassic
- —
- m of core
- 127
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 31, 1979
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- POLYGLOMAR DRILLER · Semisub steel
- Drilling days
- 166
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 0°
- Drilling permit
- 173-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.49162° N, 2.05726° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/7-6 was drilled on the East Shetland Basin in the North Sea close to the UK border. It was drilled as replacement well for wells 30/7-4 and 30/7-5, which were both junked for technical reasons. Well 30/7-6 (Phase I) was planned to be suspended after setting the 9-5/8" casing at ca 3800 m. The well would then be re-entered as 30/7-6 R (Phase II) and drilled to a TD of ca. 5000 meters employing the 11" 1000 bar BOP system. The main objective was Middle Jurassic sandstones, and this was planned to be penetrated in the re-entry. The exploration targets in the 30/7-6 well were the secondary ones: possible lower Cretaceous carbonate development, and possible Late Jurassic sandstones. The hydrocarbon-bearing Eocene sands (Frigg Formation) tested by the 30/7-2 well were also expected to be encountered within the same structural closure by this well.
Operations and results
Wildcat well 30/7-6 was spudded with the semi-submersible installation Polyglomar Driller on 15 February 1977. At 3784 m, on April 14, a massive gas kick occurred and circulation was lost. The well was killed and plugged back into the 13 3/8" casing. A sidetrack was kicked off from 2619 m. The sidetrack proceeded with the 12 1/4" hole to 3252 m and the 8 3/8" hole to 3711 m. A 7" liner was set down to 3707. The cement flash set around the running string for the liner and 18 days were spent cleaning out the hole. At this point, the well was plugged back and suspended. The well was drilled with a gel/lignosulphonate mud system.
The top of the Eocene sands were penetrated at 1783.5 m and were found to be water wet. This agrees with the observation made in 30/7-2, in which the oil water contact was defined at 1783 m. No res
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.