NORWAY · WELLBORES · NPDID 4122

6506/6-1

Exploration · Wildcat · P&A · Gas · Mobil Exploration Norway INC · PL 211

9 documents: reports, logs, and plots →

6506/6-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Mobil Exploration Norway INC, entered Jul 10, 2000, to 5,491 m in the Åre Fm.

Discovery 6506/6-1 (Victoria) · On the map →

5,491
m total depth · 5,474.2 m vertical
434
m water depth
Jul 10, 2000
entered · completed Dec 7, 2000
Åre Fm
at total depth · Early Jurassic
66.1
m of core in 3 cores
200
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED DEC 7, 2002

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST ALPHA · Semisub steel
Drilling days
150
Kelly bushing elevation
18 m
Maximum inclination
11.84000015°
Drilling permit
977-L
Licensing round
15
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.53191° N, 6.96314° E
Hydrocarbons in
Fangst Gp · Middle Jurassic
Hydrocarbons in
Båt Gp · Early Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

PL 211 covers blocks 6506/6 and 6507/4 off-shore Norway, approximately 300 km northwest of Trondheim. Well 6506/6-1, designated as High Temperature High Pressure well, was drilled by Mobil as the first commitment well for the licence. Well 6506/6-1 was drilled in the southeastern part of Block 6506/6. The primary objective of the well was to test the hydrocarbon potential of the Bella-Donna prospect, which straddles the southern parts of blocks 6506/6 and 6507/4. A faulted, 4-way dip closed dome, with prognosed 500m of vertical closure in the Jurassic Fangst and Båt Group Sandstones was the primary objective of the well. The secondary objective was to assess the Cretaceous prospectivity.

Operations and results

Wildcat well 6506/6-1 was drilled with the semi-submersible installation "West Alpha". A 9 7/8" pilot hole was spudded on 7 July 2000 and drilled to 1425 m to check for the presence of shallow gas. No shallow gas was found.

The final well was spudded on 9 July 2000 and reached TD at 5491.0 m in the Early Jurassic Åre Formation. The well was drilled with seawater and bentonite down to 1437 m, with water based KCl/Glycol mud from 1437 m to 2794 m, and with mineral oil based mud (Versapro) from 2794 m to TD. The sandstones of the Middle Jurassic Fangst Group were found to be extremely hard and abrasive and diamond impregnated bits were required to complete the section.

The geology of the well was very much as prognosed, although the tops generally came in higher than expected. No shows were observed in the sandstones of the Cretaceous Lysing, Lange and Lyr Formations.

The well penetrated a significant thickness of porous and permeable sandstone in the Middle Jurassic Ile and Lower Jurassic Tilje Formations. Hydrocarbons recovered from both indicate a dry gas containing 10% CO2. Petrophysical analysis indicates that lower reservoir quality Middle Jurassic Garn Formation and Lower Jurassic Uppe

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.