NORWAY · WELLBORES · NPDID 420

34/2-1

Exploration · Wildcat · Junked · Not applicable · Amoco Norway Oil Company · PL 056

5 documents: reports, logs, and plots →

34/2-1 is a wildcat exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Dec 29, 1979, to 807 m in the Nordland Gp.

On the map →

807
m total depth · 807 m vertical
389
m water depth
Dec 29, 1979
entered · completed Feb 23, 1980
Nordland Gp
at total depth · Pliocene
—
m of core
24
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 23, 1982

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BYFORD DOLPHIN · Semisub steel
Drilling days
57
Kelly bushing elevation
25 m
Maximum inclination
1.5°
Drilling permit
235-L
Licensing round
4
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.77446° N, 2.55172° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Exploration well 34/2-1 is located a northwestern part of the Tampen Spur area. It was intended to be the first well to test the reflections below the Base Cretaceous (Kimmeridgian) Unconformity on a seismically defined, northerly trending west-northwest dipping fault block. The well was located near the apex of the structure at the Base Cretaceous level, but down-dip with respect to deeper stratigraphy. Primary targets were the Middle Jurassic Brent Formation and the Early Jurassic/Triassic Statfjord Formation. Secondary targets were possible Early Tertiary and Late Jurassic sandstones. Planned TD was 4300 m Sub Sea.

Operations and results

Wildcat well 34/2-1 was spudded with the semi-submersible installation Byford Dolphin on 29 December 1979. Due to problems with the guide line and instability of the temporary guide base three unsuccessful spuds were made before a successful spud was made on 23 January 1980. The well was drilled to TD at 807 meters in the Tertiary. Being unable to latch the BOP onto the 20-inch wellhead, 34/2-1 was permanently abandoned on 23 February 1980 as a junked well. A total of 68 days was spent on the well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/420, documented in the API reference.