NORWAY · WELLBORES · NPDID 4209

6507/5-4

Exploration · Appraisal · P&A · Oil/gas · BP Amoco Norge AS · Skarv · PL 212

6 documents: reports, logs, and plots →

6507/5-4 is an appraisal exploration wellbore in the Norwegian Sea, drilled by BP Amoco Norge AS, entered Feb 10, 2001, to 3,812 m in the Åre Fm.

Discovery 6507/5-1 Skarv · On the map →

3,812
m total depth · 3,811.2 m vertical
421
m water depth
Feb 10, 2001
entered · completed Apr 15, 2001
Åre Fm
at total depth · Early Jurassic
211
m of core in 4 cores
124
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 15, 2003

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
STENA DEE · Semisub steel
Drilling days
65
Kelly bushing elevation
25 m
Maximum inclination
6.69999981°
Drilling permit
995-L
Licensing round
15
Plugged and abandoned
Apr 15, 2001
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.69577° N, 7.57045° E
Hydrocarbons in
Lange Fm · Early Cretaceous
Hydrocarbons in
Garn Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Exploration wells 6507/6-1 and 6507/6-2 were drilled by Saga in the period 1986 to 1991. Both were plugged and abandoned as dry with shows. The Amoco operated exploration well 6507/5-1 well was completed in 1998 and was suspended as an oil and gas discovery in the Jurassic and Cretaceous. The discovery was named Skarv while the Cretaceous part of it has informally been named Gråsel. In 1999, well 6507/5-2 was drilled by BP Amoco to appraise Skarv. The well was plugged and abandoned as a gas well. The Snadd structure was explored by the 6507/5-3 well in June 2000 and plugged and abandoned as a gas discovery.

Well 6507/5-4 was drilled on the southern C-segment of the Skarv structure. The main reservoir target was sandstone in the Early - Middle Jurassic Garn, Ile and Tilje Formations. In the discovery case the objective was to gather the data required to allow confident oil reserves estimates. High-risk secondary targets were the Cretaceous Lysing and Lange Formations.

Operations and results

Wildcat well 6507/5-4 was spudded with the semi-submersible installation Stena Dee on 10 February 2001 and drilled to TD at 3812 m (3820 m loggers depth) in the Early Jurassic sediments of the Åre Formation. The well was drilled with seawater and hi-vis sweeps down to 522 m, with KCl/glycol mud from 522 m to 1468 m, and with KCl mud from 1468 m to TD.

Well 6507/5-4 successfully completed a logging program across Cretaceous secondary targets in the 12.25" hole, and a logging and coring programme of the primary Jurassic targets in 8.5" hole. Oil shows of variable strength were recorded from 3060 in the Lange Formation and down to TD. Oil and condensate were discovered in poor quality Early Cretaceous sands. The thin Lysing Formation was tight without shows. Oil and gas were discovered from 3513 m, top of the primary Garn reservoir target, while Ile and Tilje were water-wet. A gas/oil contact was indicated at 3542 m bas

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.