34/7-31 is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Mar 10, 2001, to 2,650 m in the Tarbert Fm.

Discovery 34/7-31 · On the map →

2,650
m total depth · 2,650 m vertical
207
m water depth
Mar 10, 2001
entered · completed Apr 13, 2001
Tarbert Fm
at total depth · Middle Jurassic
33.7
m of core in 2 cores
97
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED APR 13, 2003

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SCARABEO 6 · Semisub steel
Drilling days
35
Kelly bushing elevation
26 m
Maximum inclination
2.4000001°
Drilling permit
994-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.31047° N, 2.06661° E
Hydrocarbons in
Intra Draupne Fm Ss · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/7-31 was drilled in the Borg structure, which is situated on the western side of the Vigdis and Tordis Fields. The primary objective was to appraise the 34/7-23 Discovery in Intra-Draupne Formation Sandstone in this structure. Proven reserves, if sufficient, would most probably be produced through the Vigdis Field installations. Secondary objectives were Paleocene sand (Sele/Lista Formations) in a down-flank position from well 34/7-18 were these sands were oil-filled, and Early Cretaceous sands, found oil filled in well 34/7-21. The well was to be drilled 50 m into the Brent Group, which was expected to be water bearing at well location. In case of encountering an oil-filled Intra-Draupne sand thicker than 10 m TVD in the well, a sidetrack should be drilled, kicked off below the 13 3/8" casing to further appraise the Borg structure.

Operations and results

Well 34/7-31 was spudded with the semi-submersible installation Scarabeo 6 on 10 March 2001 and drilled to TD at 2650 m in the Middle Jurassic Tarbert Formation. A 9 7/8" pilot hole was drilled from seabed 233 m to 1150 m. Logs (MWD) presented from seabed 233 m to 1150 m were recorded in the 9-7/8" pilot hole. The 9 7/8" pilot hole was then opened to 36" and 30" casing run to 306 m. The 26" hole (using 26" hole opener) deviated from the original 9 7/8" pilot hole below 306 m and the two holes were ca 27 m apart at 1150 m. Well 34/7-31 was drilled with returns to Seabed down to 1150 m. Sampling started at 1170 m. The well was drilled with seawater and hi-vis pills down to1150 m, and with Glydril KCl/polymer mud from 1150 m to TD. No gas related problems were experienced in the well. However, the MWD logs show possible gas levels at 280 m - 282 m, 372 m - 374,5 m and 558 m - 561 m.

The Intra-Draupne Formation Sandstone was encountered at 2470 with ca 35 meters net oil-bearing reservoir. Then, fourteen m of Draupne Formati

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4214, documented in the API reference.