NORWAY · WELLBORES · NPDID 434

35/8-2

Exploration · Wildcat · P&A · Gas/condensate · Norwegian Gulf Exploration Company AS · Vega · PL 058

8 documents: reports, logs, and plots →

35/8-2 is a wildcat exploration wellbore in the North Sea, drilled by Norwegian Gulf Exploration Company AS, entered Aug 30, 1981, to 4,336 m in the Statfjord Gp.

Discovery 35/8-2 Vega · On the map →

4,336
m total depth · 4,334 m vertical
376
m water depth
Aug 30, 1981
entered · completed May 21, 1982
Statfjord Gp
at total depth · Early Jurassic
88.3
m of core in 7 cores
151
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 21, 1984

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SEDCO 704 · Semisub steel
Drilling days
265
Kelly bushing elevation
26 m
Maximum inclination
0°
Drilling permit
299-L
Licensing round
4
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
61.27095° N, 3.36616° E
Hydrocarbons in
Brent Gp · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 35/8-2 is located in the Sogn Graben north of the Fram Field. The main objectives were to test the Middle Jurassic Brent Group as well as sands in the Early Jurassic Dunlin Group and Statfjord Formation on a structure located in the south western corner of the block. No reservoirs were anticipated above the Late Kimmeridge Unconformity.

Operations and results

Well 35/8-2 was spudded with the semi-submersible installation Sedco 704 on 30 August 1981 and drilled to TD at 4336 m in the Early Jurassic Statfjord Formation Formation. During hole opening of the 36" section, the drill string parted and left the bit, opener and drill collars in the hole. Fishing was unsuccessful. The well was re-spudded 11 September 1981 and the 17 1/2" pilot hole was drilled without problems. When opening to 36" washing and reaming was required. Few problems were encountered in the 26" section. While drilling the 17 1/2" hole one experienced problems with tight hole at 830 to 883 m, 1610 -1720 m and 1915 - 1940 m. Repairs of the BOP and other unrelated rig problems occurred for 13 days during the drilling of this section. Tight hole was also experienced in the upper part of the 12 1/4" section and at 3100 m where pore pressure also started increasing. Some problems were experienced when coring in the 8 1/2" section. When running in hole with a new bit, the pipe became stuck at 3662 m. Twenty-one days were spent fishing before the hole was plugged back into the 9 5/8" casing. The well was then sidetracked from 3482 m and the 8 1/2" hole was drilled down to 3954 m. Some minor problems with tight hole and differential sticking occurred. A 6 1/8" hole was then drilled to TD at 4336 m. The well was drilled with seawater / pre-hydrated bentonite / gel down to 2155 m and with seawater/bentonite/polymer/LF-5 mud from 2155 m to 3538 m. From 3538 to TD the well was drilled with KCl/polymer mud, which w

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/434, documented in the API reference.