NORWAY · WELLBORES · NPDID 4487

30/8-A-11 AH

Development · Production · Producing · Gas · Norsk Hydro Produksjon AS · Tune · PL 190

30/8-A-11 AH is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Mar 30, 2002, to 5,450 m.

Discovery 30/8-1 S Tune · On the map →

5,450
m total depth · 3,582 m vertical
93
m water depth
Mar 30, 2002
entered · completed Apr 19, 2002
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 17, 2026 · RELEASED APR 19, 2004

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA DELTA · Semisub steel
Drilling days
21
Kelly bushing elevation
29 m
Maximum inclination
—°
Drilling permit
2075-P
Licensing round
14
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
60.46754° N, 2.65346° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4487, documented in the API reference.