NORWAY · WELLBORES · NPDID 4500
34/10-46 A
Exploration · Wildcat · Re-class to dev · Oil/gas · Statoil ASA (old) · Gullfaks · PL 050
34/10-46 A is a wildcat exploration wellbore in the North Sea, drilled by Statoil ASA (old), entered Feb 1, 2002, to 6,860 m in the Tarbert Fm.
Discovery 34/10-46 A · On the map →
- 6,860
- m total depth · 2,106 m vertical
- 134
- m water depth
- Feb 1, 2002
- entered · completed Mar 16, 2002
- Tarbert Fm
- at total depth · Middle Jurassic
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAR 16, 2004
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- GULLFAKS A · Condeep 4 shafts
- Drilling days
- 44
- Kelly bushing elevation
- 82.2 m
- Maximum inclination
- 0°
- Drilling permit
- 1032-L
- Licensing round
- Awarded additionally to round 3
- Plugged and abandoned
- Mar 16, 2002
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.17607° N, 2.18978° E
- Hydrocarbons in
- No Formal Name · Late Cretaceous
- Hydrocarbons in
- Tarbert Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
p>General
Well 34/10-46 A was drilled to a structure 5 km southwest of the Gullfaks field. Due to a water-filled Statfjord Formation in segment D1 in well 34/10-46 S, it was decided to drill a side track, 34/10-46 A to the Brent Group prospect D1. The objectives of the well were to prove oil in a Cretaceous/Brent Group prospect in D1 and to be a water injector in Tarbert Formation.
Operations
The wildcat well 34/10-46 A was spudded on 2 February 2002 from the permanent installation Gullfaks A and drilled to TD at 6860 m (2105,5 m TVD RKB) in the late Cretaceous Shetland Group. The well was drilled with OBM to TD.
Kick-off point was at 3930 m (1667 m TVD MSL). In well 34/10-46 S/46 A/46 B the Brent Group in segment E1 and the Statfjord Formation in segment D1 were reached by the 12 1/4" section. At 6344 m (1920 m TVD MSL, 5 m deeper than prognosed) a gas-filled, pressure-depleted sandstone was encountered. A loss situation arose when drilling out of the sandstone and casing was set close to the top sandstone. From 6401 m to TD the well encountered Shetland shale three times and the Tarbert Formation twice.
The well missed the geological target (40 m to the west of target) and drilled too close to the western edge of the structure. This has resulted in a large uncertainty concerning the age of the uppermost sandstone between 6344 m and 6401 m. The most likely interpretation of the section is Cretaceous age. The well proved a gas column of 20 m in this sandstone (Krans Member/Kyrre Formation) and an oil column of 2 m in the Brent Group. Neither the gas-oil contact nor the oil-water contact was identified due to shale lithology at the respective depths.
The MDT measurements in the Cretaceous sandstones penetrated in 46 A show a pore pressure corresponding to ~1,36 sg EMW, as indicated by pressure prognosis given prior to drilling.
No fluid samples were collected and no coring was performed in the wel
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/4500, documented in the API reference.