NORWAY · WELLBORES · NPDID 4526

34/8-A-4 AH

Development · Production · Plugged · Oil · Norsk Hydro Produksjon AS · Visund · PL 120

34/8-A-4 AH is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 14, 2002, to 7,651 m.

Discovery 34/8-1 Visund · On the map →

7,651
m total depth · 2,972 m vertical
335
m water depth
Jun 14, 2002
entered · completed Jul 14, 2002
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUL 14, 2004

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
VISUND · Semisub steel
Drilling days
31
Kelly bushing elevation
29 m
Maximum inclination
—°
Drilling permit
2110-P
Licensing round
10-A
Plugged and abandoned
Apr 6, 2006
Core samples available
No
Cuttings samples available
No
Position · ED50
61.37028° N, 2.45950° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4526, documented in the API reference.