NORWAY · WELLBORES · NPDID 4530

6608/10-8 A

Exploration · Appraisal · P&A · Oil · Statoil ASA (old) · Urd · PL 128

3 documents: reports, logs, and plots →

6608/10-8 A is an appraisal exploration wellbore in the Norwegian Sea, drilled by Statoil ASA (old), entered Apr 12, 2002, to 2,660 m in the Tilje Fm.

Discovery 6608/10-8 Stær · On the map →

2,660
m total depth · 2,539.5 m vertical
376
m water depth
Apr 12, 2002
entered · completed Apr 26, 2002
Tilje Fm
at total depth · Early Jurassic
—
m of core
94
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 26, 2004

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
STENA DON · Semisub steel
Drilling days
15
Kelly bushing elevation
24 m
Maximum inclination
46.40000153°
Drilling permit
1036-L
Licensing round
10-B
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
66.05946° N, 8.17859° E
Hydrocarbons in
Intra Melke Fm Ss · Middle Jurassic
Hydrocarbons in
Fangst Gp · Middle Jurassic
Hydrocarbons in
Båt Gp · Early Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6608/10-8 was drilled in the Nordland II area on the Stær structure, ca 3 km north east of the Norne Field. Geologically the structure is part of the Dønna Terrace. The primary objective of the well was to prove hydrocarbons in sandstones of the Middle to Early Jurassic Garn, Ile, Tofte, and Åre Formations. The hydrocarbon potential of the Melke Formation of Late Jurassic age was considered as secondary objective. Well 6608/10-8 proved an oil-water contact in the Åre Formation. The sidetrack, 6608/10-8A was drilled in order to appraise the oilûwater contact down flank on the Stµr prospect.

Operations and results

Appraisal well 6608/10-8A was kicked off from well 6608/10-8 at 1340 m with the semi-submersible installation Stena Don on 12 April 2002, and drilled to a total depth of 2660 m (2540 m TVD RKB) in the Early Jurassic Tilje Formation. The well bore was drilled with Aquadril (KCl / polymer / glycol mud) from kick-off to TD. The oil water contact was verified to be in the Tilje Formation, approximately 5-10 m deeper than in well 6608/10-8. No cores were cut in this well bore. Water samples were acquired in 6608/10-8A. The sidetrack was permanently abandoned on 26 April 2002 as an oil appraisal.

Testing

No drill stem test was performed

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4530, documented in the API reference.