NORWAY · WELLBORES · NPDID 4540

25/11-G-19

Development · Production · Plugged · Oil · Norsk Hydro Produksjon AS · Grane · PL 169 B1

25/11-G-19 is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 3, 2002, to 4,106 m.

Discovery 25/11-15 Grane · On the map →

4,106
m total depth · 1,783 m vertical
127.5
m water depth
Jun 3, 2002
entered · completed Jun 26, 2002
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUN 26, 2004

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SCARABEO 6 · Semisub steel
Drilling days
24
Kelly bushing elevation
26 m
Maximum inclination
—°
Drilling permit
2122-P
Licensing round
13
Plugged and abandoned
Mar 31, 2014
Core samples available
No
Cuttings samples available
No
Position · ED50
59.16526° N, 2.48738° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4540, documented in the API reference.