NORWAY · WELLBORES · NPDID 4699
6608/10-10
Exploration · Wildcat · P&A · Dry · Statoil ASA (old) · PL 128
6608/10-10 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Statoil ASA (old), entered Jul 17, 2003, to 2,800 m in the Åre Fm.
- 2,800
- m total depth · 2,800 m vertical
- 374
- m water depth
- Jul 17, 2003
- entered · completed Aug 7, 2003
- Åre Fm
- at total depth · Early Jurassic
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 7, 2005
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- STENA DON · Semisub steel
- Drilling days
- 22
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 3.5°
- Drilling permit
- 1047-L
- Licensing round
- 10-B
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 66.07164° N, 8.16983° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6608/10-10 is located on the Dønna Terrace offshore Mid Norway in the south central part of the block. It was drilled to test the Gråspett structure, which consists of two rotated fault blocks north of the Norne and Stær Fields. The primary objective was to prove hydrocarbons in the Middle and Early Jurassic sandstones of the Not and Åre Formations. Secondary objective was to prove hydrocarbons in the Late Jurassic sandstones of the Melke Formation.
Operations and results
Wildcat well 6608/10-10 was spudded with the semi-submersible installation Stena Don on 17 July 2003 and drilled to TD at 2800 m in the Early Jurassic Åre Formation. The well was drilled with sea water and hi-vis pills down to 1377 m and with KCl/Pac/glycol mud from 1377 m to TD. Severe hole problems with tight spots and repeated fall-out of large quantities of cavings were experienced in the bottom 12 1/4" section of the well. The KCl content in the mud used in 6608/10-10 represents the largest concentrations compared to the previous nearby wells. It is believed that this KCl content caused the instability in the Brygge, Tare and Tang Formations. Due to these hole problems the reservoirs were not logged with wire line logs.
Three sandstone beds in the Melke Formation were penetrated and proven to be water wet. The sandstones in the Fangst and Båt Groups were also water wet. No hydrocarbons were proven in the well.
No cores were cut and no wire line fluid samples were taken.
The well was permanently abandoned on 7 August 2003 as a dry well.
Testing
No drill stem test was performed.
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.