6405/7-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Statoil ASA (old), entered Jun 20, 2003, to 4,300 m in the Lysing Fm.

Discovery 6405/7-1 (Ellida) · On the map →

4,300
m total depth · 4,299 m vertical
1,206
m water depth
Jun 20, 2003
entered · completed Oct 10, 2003
Lysing Fm
at total depth · Late Cretaceous
124.2
m of core in 7 cores
129
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED OCT 10, 2005

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST NAVIGATOR · Vessel
Drilling days
113
Kelly bushing elevation
36 m
Maximum inclination
7.19999981°
Drilling permit
1060-L
Licensing round
17
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.28789° N, 5.13294° E
Hydrocarbons in
Nise Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 6405/7-1 was drilled in 1206 m water depth on the Grip High, ca 75 km due north of the Ormen Lange Field in the Norwegian Sea. The primary target was the Nise Formation of Campanian age. Secondary targets were the Lysing Formation of Coniacian age and a Danian lead, the Egga Member Equivalent. In addition, understanding of a mapped flat event was a main objective for this well.

Operations and results

Well 6405/7-1 was spudded with the dynamically positioned drill ship West Navigator on 21 June 2003 and drilled to TD at 4300 m in the Late Cretaceous Lysing Formation. In the 12 1/4" several incidents with high gas levels and also gain in the active system were recorded and responded to. In the end the mud weight had been increased from initially 1,33 g/cm3 when drilling to core point at 2816 m, to 1,42 g/cm3 prior to pulling out of the hole. The decision was made to plug back the 12 1/4" hole and initiate a technical side track (T2) with an 11 3/4" liner set above top of the reservoir. When the well was at TD and the discovery confirmed quality MWD data from the 26" section interval had to be collected. To obtain this a new 8 1/2" hole was drilled 15 m from the original hole from seafloor to 1920 m using LWD in one derrick, while performing wire line logging in the other. The well was drilled with seawater and hi-vis pills down to 1910 m and with Glydril DW (water based KCl/NaCl/Glycol/MEG/polymer) from 1910 m to TD. The post-TD 8 1/2" hole for MWD logging was drilled with seawater and hi-vis sweeps.

The primary target, the Nise Formation, 2757 m to 2816 m in well 6405/7-1 and 2760.6 m to 2960 m in 6405/7-1T2, consists of layered/laminated and bioturbated claystones, siltstones and sandstones with poor reservoir quality. The Nise formation proved to be oil-bearing from the top at 2760.5 m and down to 2823 m. However, good oil shows are also described below this depth, to the base of t

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4749, documented in the API reference.