NORWAY · WELLBORES · NPDID 4749
6405/7-1
Exploration · Wildcat · P&A · Oil · Statoil ASA (old) · PL 281
6405/7-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Statoil ASA (old), entered Jun 20, 2003, to 4,300 m in the Lysing Fm.
Discovery 6405/7-1 (Ellida) · On the map →
- 4,300
- m total depth · 4,299 m vertical
- 1,206
- m water depth
- Jun 20, 2003
- entered · completed Oct 10, 2003
- Lysing Fm
- at total depth · Late Cretaceous
- 124.2
- m of core in 7 cores
- 129
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED OCT 10, 2005
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- WEST NAVIGATOR · Vessel
- Drilling days
- 113
- Kelly bushing elevation
- 36 m
- Maximum inclination
- 7.19999981°
- Drilling permit
- 1060-L
- Licensing round
- 17
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 64.28789° N, 5.13294° E
- Hydrocarbons in
- Nise Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Wildcat well 6405/7-1 was drilled in 1206 m water depth on the Grip High, ca 75 km due north of the Ormen Lange Field in the Norwegian Sea. The primary target was the Nise Formation of Campanian age. Secondary targets were the Lysing Formation of Coniacian age and a Danian lead, the Egga Member Equivalent. In addition, understanding of a mapped flat event was a main objective for this well.
Operations and results
Well 6405/7-1 was spudded with the dynamically positioned drill ship West Navigator on 21 June 2003 and drilled to TD at 4300 m in the Late Cretaceous Lysing Formation. In the 12 1/4" several incidents with high gas levels and also gain in the active system were recorded and responded to. In the end the mud weight had been increased from initially 1,33 g/cm3 when drilling to core point at 2816 m, to 1,42 g/cm3 prior to pulling out of the hole. The decision was made to plug back the 12 1/4" hole and initiate a technical side track (T2) with an 11 3/4" liner set above top of the reservoir. When the well was at TD and the discovery confirmed quality MWD data from the 26" section interval had to be collected. To obtain this a new 8 1/2" hole was drilled 15 m from the original hole from seafloor to 1920 m using LWD in one derrick, while performing wire line logging in the other. The well was drilled with seawater and hi-vis pills down to 1910 m and with Glydril DW (water based KCl/NaCl/Glycol/MEG/polymer) from 1910 m to TD. The post-TD 8 1/2" hole for MWD logging was drilled with seawater and hi-vis sweeps.
The primary target, the Nise Formation, 2757 m to 2816 m in well 6405/7-1 and 2760.6 m to 2960 m in 6405/7-1T2, consists of layered/laminated and bioturbated claystones, siltstones and sandstones with poor reservoir quality. The Nise formation proved to be oil-bearing from the top at 2760.5 m and down to 2823 m. However, good oil shows are also described below this depth, to the base of t
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/4749, documented in the API reference.