NORWAY · WELLBORES · NPDID 4755

30/3-A-3 B

Development · Production · Plugged · Oil · Statoil ASA (old) · Veslefrikk · PL 052

30/3-A-3 B is a production development wellbore in the North Sea, drilled by Statoil ASA (old), entered Sep 29, 2003, to 6,723 m.

Discovery 30/3-2 Veslefrikk · On the map →

6,723
m total depth · 2,931 m vertical
175
m water depth
Sep 29, 2003
entered · completed Oct 10, 2003
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED OCT 10, 2005

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
VESLEFRIKK A · Jacket 4 legs
Drilling days
12
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
2293-P
Licensing round
4
Plugged and abandoned
Apr 9, 2009
Core samples available
No
Cuttings samples available
No
Position · ED50
60.78270° N, 2.89785° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4755, documented in the API reference.