NORWAY · WELLBORES · NPDID 4761

35/8-5 S

Exploration · Wildcat · P&A · Shows · Norsk Hydro Produksjon AS · PL 195

7 documents: reports, logs, and plots →

35/8-5 S is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 1, 2003, to 4,000 m in the Rannoch Fm.

On the map →

4,000
m total depth · 3,831.8 m vertical
369
m water depth
Jun 1, 2003
entered · completed Jul 20, 2003
Rannoch Fm
at total depth · Middle Jurassic
99.2
m of core in 6 cores
138
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 20, 2005

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA DELTA · Semisub steel
Drilling days
50
Kelly bushing elevation
29 m
Maximum inclination
37.09999847°
Drilling permit
1063-L
Licensing round
14
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.37792° N, 3.65367° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 35/8-5 S was drilled on a location ca 15 km west of the Gjøa Field on the western margin of the Måløy Slope in the northern North Sea. The main objective was to test the presence and type of hydrocarbons in Oxfordian turbidites in the J10 Prospect. A secondary objective of the well was to test the hydrocarbon potential of the Brent Group Sandstones. The well was targeted in the W-segment of the prospect, close to the eastern boundary fault, in order to enable a possible sidetrack towards east and into the C-segment. To meet these criteria, the well was designed as a deviation well to follow the dip of the eastern boundary fault plane of the W-segment in a proper distance from the fault. Sidetracking was only to be performed in case of discovery in either the primary or the secondary target.

Operations and results

Wildcat well 35/8-5 S was spudded with the semi-submersible installation Deepsea Delta on June 1 2003 and drilled to TD at 4000 m (3831.8 m TVD) in the Middle Jurassic Rannoch Formation. It was discovered after spud that the spud position of the well was placed 105 m east of the planned spud location. The deviation was adjusted during drilling and the reservoir was penetrated within the planned target tolerance. The resulting well path was vertical down to 2315 m, and then deviated with variable inclination down to ca 3300 m, then keeping a fairly constant inclination of 36 deg throughout the last 700 m to TD. A drilling hazard was given due to possible water flow from over-pressured sand interval in the Skade Formation at 673.5 - 794 m. This sand was considerably thicker than prognosed. There was no overpressure in the interval, but two thinner sands above, at 570 m and 590 m, where water flow occurred, were over

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4761, documented in the API reference.